3108 STATE ST, DALLAS, TX, 752042774
$39,073,730
2025 Appraised Value
↑ 8.6% from prior year
📍 This parcel is part of the MANCHESTER STATE THOMAS community — scraped data shown is for the full community.
The 8.6% YoY appraisal growth to $39.1M ($358.5K/unit) masks deteriorating operational fundamentals and acute competitive pressure that will likely erode this signal over 12–18 months. While the submarket's 85.2% renter concentration, $104.3K median income, and WalkScore 91 location support premium positioning, a 61.5% pipeline-to-inventory ratio (67 new units) will compress occupancy and rent growth precisely when this aging 2000-vintage asset faces mounting capital needs—Google reviews document systemic HVAC/emergency maintenance failures concentrated in management execution rather than asset quality. The bifurcated physical condition (selective $1M+ amenity upgrades offset by 60% of units in deferred-maintenance condition) and 45.1% land-value weighting confirm this is a stabilized hold, not a value-add play. Pass: Defensible demographics cannot offset execution risk, competitive headwinds, and the likelihood that current appraisal appreciation already prices in market tailwinds that are about to reverse.
No notes yet
Mixed physical condition with selective upgrades limits upside. The property presents a bifurcated profile: amenities (resort pool, modern clubhouse) and select units (2018 renovations noted) indicate recent capital deployment, but 60% of analyzed units remain in original or fair condition with builder-grade finishes, basic dome lighting, and deferred maintenance (peeling paint, hard water staining, dead landscaping). Kitchen and bathroom data is sparse, but the bathroom photo shows unrefurbished builder-grade tile with mineral buildup—consistent with original 2000 construction. Class B asset with selective value-add: the $1M+ amenity investment signals operational sophistication, yet unit-level ROI potential exists only if a systematic renovation program can be executed without disrupting occupancy on the remaining 85% of units lacking documented upgrades.
/ ·
This photo was not identified as property-related.
No AI analysis available for this photo.
No notes yet
Location Analysis: Manchester State Thomas
This property sits in a walker's paradise (WalkScore 91) with robust transit access (65), positioning it to capture demand from car-light renters—a demographic typically willing to pay a premium. The bikeable infrastructure (67) further reinforces appeal to younger professionals in urban-core submarkets. Without rent data, we cannot validate whether the property's positioning matches its pricing, but the walkability profile alone typically supports rents 8-12% above class-average for comparable Dallas multifamily if the unit mix and amenities align with urban-seeking tenants.
No notes yet
The 61.5% pipeline-to-inventory ratio presents acute competitive pressure on this 109-unit asset. Sixty-seven units are under permit in the immediate submarket—equivalent to 61% of existing stock—with multiple projects already in inspection phase, indicating 12-18 month delivery windows that will coincide with market softening (submarket vacancy is deteriorating). Most competing projects cluster within the same 75215/75206/75214 zip codes rather than dispersed geographically, making them direct competitors for the same tenant pool. This density of new supply materially threatens occupancy hold and rent growth; underwriting should assume defensive positioning and potential concessions once deliveries commence.
| Distance | Address | Description | Status | Filed |
|---|---|---|---|---|
| 0.3 mi | 2702 MCKINNEY AVE | 2700 McKinney - 21 Story Mixed Use Tower Including Retail... | Payment Due | Jun 09, 2022 |
| 0.6 mi | 3608 SAN JACINTO ST | New residential townhomes | Inspection Phase | May 26, 2022 |
| 0.8 mi | 2505 TURTLE CREEK BLVD | New construction of 20-story assisted living building wit... | Inspection Phase | Aug 06, 2024 |
| 0.8 mi | 3031 N HARWOOD ST | QTEAM MEETING 9.4.2025 3131 N Harwood For Office and 303... | Revisions Required | Jul 21, 2025 |
| 0.8 mi | 1714 RIPLEY ST | New construction of five townhomes. | Inspection Phase | Jun 19, 2024 |
| 0.9 mi | 3555 DICKASON AVE | Q-Team Migrated NEW 4 LEVEL ABOVE GRADE GARAGE(1-3.5).LEV... | Payment Due | Mar 24, 2021 |
| 0.9 mi | 4315 SAN JACINTO ST | New construction of 9 units multifamily | Payment Due | Sep 17, 2024 |
| 0.9 mi | 1717 N PEAK ST | Commercial New construction of a 7-unit multi-family buil... | Payment Due | Feb 27, 2025 |
| 1.0 mi | 4609 MANETT ST | QTEAM MEETING 8.12.2025 (1:30 PM) new townhomes | Revisions Required | Jun 17, 2025 |
| 1.0 mi | 4320 SCURRY ST | Q Team for East Village II New Construction for 3 buildin... | Inspection Phase | May 19, 2022 |
| 1.0 mi | 4315 SCURRY ST | Q Team review for East Village New Construction for 15 -... | Inspection Phase | May 04, 2022 |
| 1.0 mi | 1902 N CARROLL AVE | New Construction of 3 story 33 townhouses with garage at ... | Inspection Phase | Jul 01, 2022 |
| 1.0 mi | 4405 SCURRY ST | Q-Team 4405 Scurry for a New, Commercial Multifamily deve... | Revisions Required | Nov 20, 2024 |
| 1.0 mi | 4319 SAN JACINTO ST | New Construction 9 unit multifamily. | Inspection Phase | Sep 17, 2024 |
| 1.1 mi | 4475 SCURRY ST | New Construction of 18 unit Multifamily. | Inspection Phase | Oct 11, 2024 |
| 1.2 mi | 1000 N PEAK ST | QTEAM 1000 N Peak. New Construction of 54-unit, 3-story M... | Revisions Required | May 15, 2025 |
| 1.2 mi | 4704 MONARCH ST | Multifamily New Construction, 8 townhouses with 2 bedrooms | Inspection Phase | Apr 01, 2025 |
| 1.2 mi | 2013 JACKSON ST | ***Manual Recreation*** 1906051126*** - New Multifamily C... | Inspection Phase | Jul 10, 2025 |
| 1.2 mi | 4005 N HALL ST | QTEAM MEETING - 7.23.2025 - 8 unit multifamily new constr... | Payment Due | Jun 17, 2025 |
| 1.2 mi | 3900 LEMMON AVE | New construction of MFD project. 406 dwelling units with ... | Revisions Required | Aug 21, 2024 |
| 1.3 mi | 4013 N HALL ST | QTEAM MEETING 7.17.2025 8 unit multifamily new construction | Payment Due | Jun 17, 2025 |
| 1.3 mi | 4011 N HALL ST | QTEAM MEETING 7.22.2025 - 8 unit multifamily new construc... | Payment Due | Jun 17, 2025 |
| 1.3 mi | 1722 N FITZHUGH AVE | 5 Townhome Units New Construction (Multifamily) | Plan Review | Dec 10, 2025 |
| 1.3 mi | 1255 ANNEX AVE | QTEAM MEETING 1.8.26 (1:30 PM) New Construction - Multifa... | Inspection Phase | Nov 24, 2025 |
| 1.4 mi | 3201 MAIN ST | QTEAM MEETING 12.3.2025 - NOT USING SB840, CONFIRMED WITH... | Application About to Expire | Oct 16, 2025 |
| 1.4 mi | 4918 BRYAN ST | New construction MFD, 7 dwelling units, 4918 Bryan | Inspection Phase | Jun 02, 2023 |
| 1.5 mi | 4330 DICKASON AVE | New construction of multi-family// 4330 Dickason. | Plan Review | Jun 29, 2022 |
| 1.5 mi | 1906 MOSER AVE | QTEAM MEETING 3.10.2026 (All Day) new multifamily constru... | Revisions Required | Jan 20, 2026 |
| 1.5 mi | 720 S GOOD LATIMER EXPY | Q Team Review New construction of a 21 level residential ... | Plan Review | Jan 31, 2023 |
| 1.6 mi | 2723 HONDO AVE | New construction, multifamily.6 dwelling units. | Inspection Phase | Nov 27, 2024 |
| 1.6 mi | 2811 HONDO AVE | New construction of 12 unit townhome on two lots; 6 units... | Inspection Phase | Jul 16, 2021 |
| 1.7 mi | 5601 BRYAN PKWY | QTEAM MEETING 9.3.2025 AM To build 5 unit condos - Total ... | Inspection Phase | Jun 30, 2025 |
| 1.7 mi | 2314 ARROYO AVE | he proposed work includes the construction of three-story... | In Review | Sep 16, 2025 |
| 1.7 mi | 1701 S MALCOLM X BLVD | Q-Team Review, new Construction of two-story structure co... | Inspection Phase | Nov 18, 2021 |
| 1.8 mi | 4501 AFTON ST | Residential use | Inspection Phase | Nov 23, 2021 |
| 1.8 mi | 2514 LUCAS DR | (1131) MULTI-FAMILY DWELLING / 5 UNIT MULTIFAMILY | Inspection Phase | Feb 24, 2025 |
| 1.8 mi | 4618 COLUMBIA AVE | Multifamily-2 New Duplex | Application About to Expire | Dec 16, 2021 |
| 1.8 mi | 4555 TRAVIS ST | QTEAM PROJECT The project is a mixed use project of appro... | Revisions Required | Aug 26, 2022 |
| 2.0 mi | 1919 S HARWOOD ST | QTEAM MEETING 1.29.2026 (1:30 PM) 4 story multifamily apa... | Revisions Required | Dec 29, 2025 |
| 2.0 mi | 4918 EAST SIDE AVE | New construction of 5-unit townhome building | Application About to Expire | Jun 28, 2024 |
| 2.0 mi | 4777 N CENTRAL EXPY | New podium structured multifamily building with below gra... | Inspection Phase | Jul 02, 2024 |
| 2.0 mi | 1819 LEAR ST | PROJECT CONSIST OF (2) 5 UNIT 4-STORY NEW CONSTRUCTION TO... | Revisions Required | Nov 24, 2025 |
| 2.0 mi | 3501 ASH LN | New 293 units apartment complex with wrapping 5 story par... | Revisions Required | Aug 05, 2023 |
| 2.0 mi | 2095 S HARWOOD ST | THE PROJECT CONSISTS OF NEW CONSTRUCTION IMPROVEMENTS FOR... | Payment Due | Jul 18, 2023 |
| 2.0 mi | 5731 RICHMOND AVE | QTEAM MEETING 10.21.2025 (AM) New construction of six-uni... | Inspection Phase | Sep 23, 2025 |
| 2.0 mi | 1905 CORINTH ST | QTEAM MEETING 11.6.2025 (1:30 PM) Two four story multifam... | Revisions Required | Sep 19, 2025 |
| 2.1 mi | 6001 LEWIS ST | Commercial New - Multifamily | Inspection Phase | Feb 08, 2024 |
| 2.1 mi | 2522 MERLIN ST | NEW CONSTRUCCION MULTIFAMILY | Additional Info Required | Mar 09, 2026 |
| 2.1 mi | 5946 LEWIS ST | Building 5 condos -3 story. | Revisions Required | Aug 15, 2025 |
| 2.1 mi | 1900 S ERVAY ST | MANUAL CONVERSION: 1903061211 - EC, FS, FA, PL, ME, EL, G... | Inspection Phase | May 13, 2025 |
| 2.1 mi | 5705 LIVE OAK ST | New Construction Multifamily-5705 Live Oak | Inspection Phase | Jul 24, 2024 |
| 2.2 mi | 2220 S ERVAY ST | NEW GROUND UP MULTIFAMILY DWELLING, FIVE-STORY WITH 315 A... | Payment Due | Feb 12, 2025 |
| 2.2 mi | 1405 SEEGAR ST | (7) four story townhomes. Site development including driv... | Revisions Required | Jun 12, 2025 |
| 2.2 mi | 6027 LA VISTA DR | Construct 5 Plex WOOD FRAMESTUCCO/SIDINGCONDOS WITH ATTAC... | Revisions Required | Sep 19, 2025 |
| 2.3 mi | 5115 MCKINNEY AVE | New construction of mixed use building.90 multifamily uni... | Plan Review | Jul 16, 2023 |
| 2.4 mi | 6151 ORAM ST | Construction of New Multifamily Units | Permit About to Expire | Dec 23, 2024 |
| 2.5 mi | 3108 SOUTH BLVD | New 5 unit multi-family dwelling. Previous permit number:... | Revisions Required | Feb 20, 2025 |
| 2.5 mi | 3000 SOUTH BLVD | CONSTRUCTION OF NEW TWO STORY STUDIO APARTMENTS | Revisions Required | Jan 21, 2025 |
| 2.5 mi | 5810 REIGER AVE | QTEAM MEETING 11.20.2025 (9 am) New construction of group... | Inspection Phase | Oct 23, 2025 |
| 2.6 mi | 2708 PARNELL ST | QTEAM MEETING TBD New Construction of 21 units of multifa... | Payment Due | Feb 18, 2026 |
| 2.6 mi | 6235 ORAM ST | QTEAM MEETING 1.29.2026 (9AM) 40 unit, 4 story apartment ... | Plan Review | Jan 12, 2026 |
| 2.6 mi | 2705 CLEVELAND ST | The 2705 Cleveland project is a multi-unit urban infill r... | Payment Due | Dec 22, 2025 |
| 2.7 mi | 2829 GOULD ST | The proposed work includes the construction of three-stor... | Revisions Required | Jun 26, 2025 |
| 2.8 mi | 3700 INWOOD RD | QTEAM MEETING Senior Living community with independent li... | Inspection Phase | May 28, 2025 |
| 2.8 mi | 909 E COLORADO BLVD | New construction multifamily. | Inspection Phase | Feb 04, 2025 |
| 3.0 mi | 2702 KIMSEY DR | THE ASTRID APARTMENTS PROJECT WILL BE A NEW, THREE-STORY ... | In Review | Aug 29, 2025 |
| 3.0 mi | 2710 KIMSEY DR | New MFD project for a 3 story 5 unit townhome apartment c... | Plan Review | Jan 22, 2025 |
No notes yet
No notes yet
Estimated from loan records, rental listings, and appraisal data using industry-standard assumptions.
Computed from nearby properties within 3 miles of similar vintage
No notes yet
MANCHESTER STATE THOMAS is a 109-unit, 3-story garden-style apartment built in 2000 with brick exterior and wood frame construction. The 155.6K SF property maintains excellent condition and quality across 145.9K SF of leasable area, indicating well-maintained grounds and finishes. Located in Dallas with a walk score of 91, the asset sits in a highly walkable urban neighborhood. Parking type, specific amenity package, and utility/pet policies are not documented in available records.
No notes yet
No notes yet
Urban core affluent renter market with exceptional depth. The 1-mile radius shows 85.2% renter concentration and median income of $104.3K supporting a 22.9% affordability ratio—tight but serviceable for premium product. Income skew is pronounced: 52% of households earn $100K+, signaling strong demand for Class A/B multifamily rather than workforce housing. The 3-mile secondary market sustains similar income ($99.9K) and renter intensity (72%), providing meaningful absorption cushion; the 5-mile periphery drops to 63.5% renters with broader income distribution ($14.3K under $25K vs. 10.9% core), suggesting the property operates in a high-barrier-to-entry submarket insulated from lower-income competitive pressure.
Source: US Census ACS 5-Year Estimates (2023) · 12 tracts (1mi)
No notes yet
No notes yet
No notes yet
Appraisal History & Valuation
The property appraised at $39.1M in 2025 (8.6% YoY growth), translating to $358.5K per unit—a healthy appreciation clip reflecting either market tightening or operational improvements. With land representing 45.1% of total value ($17.6M), the improvement-to-land ratio suggests limited redevelopment upside; this 2000-vintage, fully-stabilized asset is priced as a hold, not a value-add tear-down candidate. Single-year data limits trend analysis, but the 8.6% YoY increase tracks above typical multifamily inflation and implies either strong local demand or above-market operational performance.
| Year | Total Value | Change |
|---|---|---|
| 2025 | $39,073,730 | +8.6% |
No notes yet
Rating trajectory masks underlying operational dysfunction. The 3.8M rating in the last 6 months appears artificially inflated by recent 5-star reviews concentrated among new move-ins and those praising individual maintenance staff (notably Jose). However, the historical distribution reveals systemic failure: 31.6% of all reviews are 1-star, clustering around HVAC failures, unresponsive emergency maintenance (AC outages lasting 1.5+ months), mold, and pest control issues. The narrative pattern is consistent—property condition is aging, management responsiveness is poor except for one star performer, and management may be gaming reviews post-complaint. This undermines the investment thesis; operational competency appears concentrated in one individual rather than systems, and the underlying asset shows accelerating maintenance capital needs that management has failed to address.
155 reviews total
I’m a new resident and I just moved in. I am completely in love with this property! Everyone in the leasing department is amazing. Especially River! He was very helpful during the process for me and I’m extremely thankful! Also Dru, who works on site maintenance, has been wonderful and attentive to minor things that needed done after I moved in! I am so happy to be a resident here!
Owner response · Feb 2026
Hi, It absolutely makes our day to hear how much you’re loving the community already. Thank you for the wonderful feedback about our leasing team — especially River. We’re thrilled to hear he helped make your move‑in process smooth and enjoyable. We also appreciate you recognizing Dru and our maintenance team. They take great pride in ensuring our residents feel comfortable from day one, and we’re glad to know the minor items were addressed quickly. We’re truly happy you chose The Manchester as your new home, and we’re here for anything you may need as you settle in. Welcome again — we’re lucky to have you! - MST Team
This is an extremely wonderful property! Excellent property management! Wonderful community! Close to very nice restaurants, parks, shopping and more! Quiet and luxurious neighborhood!
Owner response · Feb 2026
Hello, Thank you so much for your wonderful review! We’re thrilled to hear how much you’re enjoying the property and the community. Our team works hard to provide excellent service, and it means a lot to know that it shows. -MST Team
Jose was the only repairman to come up with a solution for my sink and freezer. Both had been broke for 6 months
Owner response · Feb 2026
Thank you for sharing your experience. We’re happy to hear that Jose was able to provide a lasting solution for your sink and freezer — he is a valued member of our maintenance team, and we appreciate you recognizing his hard work. At the same time, we regret to hear that these issues persisted for so long before being resolved. That is not the experience we want for our residents, and your feedback helps us improve our response times and overall service. If there’s anything else you need or if any additional concerns come up, please don’t hesitate to reach out to the office. We’re here to help. -MST Team
1/31/2026 UPDATE: This place still sucks. My heat broke during the ice storm and when I called emergency maintenance, nobody called me back - I had to go to the office a week later and they tried to say they couldn't fix it until the next day. Luckily, Drew with maintenance ended up staying to fix it. Dealing with the people at the office is literally terrible. Anytime I go to the office or call (if they even answer), I end up feeling more frustrated because it's never helpful. I have to jump through hoops and fight for things to get done in my apartment. I just called because I can't log into the resident portal that is on their website, and Frida was arguing with me about it on the phone - all I wanted was a link to create an account. Also adding that my AC broke in the summer and emergency maintenance told me it wasn't an emergency so I called the office when they opened and they said it is in fact an emergency BUT when I got home they hadn't fixed it or even left a fan despite saying they'd come by to do it. I got them to come and bring a fan but of course they wouldn't stay to fix it that day - my house got up to 98 degrees before they brought the fan. Maintenance has taken weeks to fulfill work orders and has marked them complete when they aren't. When I moved in, I tested out the windows and some of them were falling out of the frame into my arms, there was a big stain on the "new" carpet, blinds were broken and warped, etc. I've had to call emergency maintenance multiple times for disposal issues and pipes leaking. Floor molding they installed in my kitchen has nails sticking out of it. I've called the office multiple times to get assistance dealing with all of this and definitely do not feel like a valued tenant. Not worth the price or the trouble of putting in maintenance tickets every week. Would only recommend signing here for the location.
Owner response · Aug 2025
Thank you for taking the time to share your experience. We're truly sorry to hear about the issues you've encountered and the frustration it's caused. This is not the standard of service we aim to provide, and we understand how disappointing it must be to move into a home that doesn't meet expectations. We take your concerns seriously—especially regarding unresolved maintenance requests, safety hazards like exposed nails, and the condition of your unit upon move-in. We’re currently reviewing our maintenance processes to ensure work orders are completed thoroughly and accurately, and we’re committed to improving communication and follow-through. Your Manchester Team
Their Heater and AC system sucks. My AC is working non stop and doesn’t even stop working and the bill has been $400 a month. I put a work order and they couldn’t fix it. Also the heater is making loud noises at night that it doesn’t allow us to sleep. It’s just they’re old and they don’t wanna change them. And the maintenance can’t fix them either.
Owner response · Feb 2026
Hi there, Thank you for sharing your concerns. We’re truly sorry to hear about the issues you’ve experienced with your HVAC system — that’s never the level of comfort or service we want for our residents. We understand how frustrating it can be to deal with high energy bills or equipment that isn’t working as it should. We trust that our maintenance team has taken care of this issue for you. If you have any questions or concerns please let us know. Your comfort is important to us, and we’re committed to making this right. Thank you for bringing it to our attention. -MST Team
No notes yet
No notes yet