2323 N AKARD ST, DALLAS, TX, 75201
$47,551,510
2025 Appraised Value
↑ 8.0% from prior year
📍 This parcel is part of the THE CHRISTOPHER (65% NON-TIF) community — scraped data shown is for the full community.
The 35% TIF creates structural headwinds that offset strong asset fundamentals and location quality. The property appraised at $47.6M ($440.3K/unit) with healthy 8.0% YoY appreciation, and its Walker's Paradise positioning (Walk Score 95, Transit Score 75) in an affluent 1-mile ring ($107.4K median income, 87.6% renter concentration) supports premium pricing power for a 2016 vintage tower. However, a 68-unit pipeline (63% of total inventory) delivering through 2026–27 into a tightening submarket vacancy trend presents material near-term pressure on occupancy and rate growth—absorbing this supply without concessions will be difficult given the narrow demographic support (52.6% of the 1-mile ring earns $100K+, with sharp income deterioration beyond 3 miles). The TIF structure likely constrains equity returns and financing flexibility; absence of current rent data prevents validation of whether unit pricing already reflects walkability premiums or represents upside. This is a watch-list property pending supply absorption trajectory and confirmation of rent positioning versus comparable urban Dallas assets.
No notes yet
/ ·
This photo was not identified as property-related.
No AI analysis available for this photo.
No notes yet
Location Profile:
Walk Score of 95 and Transit Score of 75 position THE CHRISTOPHER in Dallas's top urban tier—pedestrian-dependent tenants can meet daily needs without a car, while the excellent transit access (likely DART rail proximity) unlocks broader DFW employment connectivity. Bike Score of 71 further reinforces dense, mixed-use surroundings with restaurant and retail concentration. However, without rent data, we cannot validate whether pricing captures this Walker's Paradise positioning—comparable urban Dallas assets (Uptown, Design District) typically command $2.0M–$2.5M rents to justify these walkability premiums. The 35% TIF designation suggests revitalization-phase location; confirm whether unit absorption and rent growth track Dallas CBD/established urban submarket benchmarks or lag due to neighborhood transition risk.
No notes yet
Pipeline supply poses material headwind to near-term value creation. The 68-unit construction pipeline represents 63.0% of The Christopher's 108-unit inventory, a density that will pressure occupancy and rent growth through 2026-27. Most permits are in early-stage review (revisions required, plan review, payment due), suggesting staggered deliveries rather than a cliff, but the submarket's deteriorating vacancy trend indicates insufficient demand cushion to absorb this supply influx without rate concessions. Competitive positioning depends on asset quality and unit economics relative to these pipeline projects, which span multiple Dallas submarkets (Bishop Arts, Deep Ellum, South Dallas corridors) rather than clustering as direct competitors.
| Distance | Address | Description | Status | Filed |
|---|---|---|---|---|
| 0.5 mi | 3031 N HARWOOD ST | QTEAM MEETING 9.4.2025 3131 N Harwood For Office and 303... | Revisions Required | Jul 21, 2025 |
| 0.6 mi | 2702 MCKINNEY AVE | 2700 McKinney - 21 Story Mixed Use Tower Including Retail... | Payment Due | Jun 09, 2022 |
| 0.9 mi | 2505 TURTLE CREEK BLVD | New construction of 20-story assisted living building wit... | Inspection Phase | Aug 06, 2024 |
| 1.0 mi | 2013 JACKSON ST | ***Manual Recreation*** 1906051126*** - New Multifamily C... | Inspection Phase | Jul 10, 2025 |
| 1.2 mi | 3555 DICKASON AVE | Q-Team Migrated NEW 4 LEVEL ABOVE GRADE GARAGE(1-3.5).LEV... | Payment Due | Mar 24, 2021 |
| 1.2 mi | 3608 SAN JACINTO ST | New residential townhomes | Inspection Phase | May 26, 2022 |
| 1.5 mi | 1714 RIPLEY ST | New construction of five townhomes. | Inspection Phase | Jun 19, 2024 |
| 1.5 mi | 720 S GOOD LATIMER EXPY | Q Team Review New construction of a 21 level residential ... | Plan Review | Jan 31, 2023 |
| 1.6 mi | 3900 LEMMON AVE | New construction of MFD project. 406 dwelling units with ... | Revisions Required | Aug 21, 2024 |
| 1.6 mi | 1717 N PEAK ST | Commercial New construction of a 7-unit multi-family buil... | Payment Due | Feb 27, 2025 |
| 1.6 mi | 4013 N HALL ST | QTEAM MEETING 7.17.2025 8 unit multifamily new construction | Payment Due | Jun 17, 2025 |
| 1.6 mi | 4011 N HALL ST | QTEAM MEETING 7.22.2025 - 8 unit multifamily new construc... | Payment Due | Jun 17, 2025 |
| 1.6 mi | 4005 N HALL ST | QTEAM MEETING - 7.23.2025 - 8 unit multifamily new constr... | Payment Due | Jun 17, 2025 |
| 1.7 mi | 2811 HONDO AVE | New construction of 12 unit townhome on two lots; 6 units... | Inspection Phase | Jul 16, 2021 |
| 1.7 mi | 4320 SCURRY ST | Q Team for East Village II New Construction for 3 buildin... | Inspection Phase | May 19, 2022 |
| 1.7 mi | 4319 SAN JACINTO ST | New Construction 9 unit multifamily. | Inspection Phase | Sep 17, 2024 |
| 1.7 mi | 4315 SCURRY ST | Q Team review for East Village New Construction for 15 -... | Inspection Phase | May 04, 2022 |
| 1.7 mi | 4330 DICKASON AVE | New construction of multi-family// 4330 Dickason. | Plan Review | Jun 29, 2022 |
| 1.7 mi | 1902 N CARROLL AVE | New Construction of 3 story 33 townhouses with garage at ... | Inspection Phase | Jul 01, 2022 |
| 1.7 mi | 4315 SAN JACINTO ST | New construction of 9 units multifamily | Payment Due | Sep 17, 2024 |
| 1.7 mi | 3201 MAIN ST | QTEAM MEETING 12.3.2025 - NOT USING SB840, CONFIRMED WITH... | Application About to Expire | Oct 16, 2025 |
| 1.7 mi | 4405 SCURRY ST | Q-Team 4405 Scurry for a New, Commercial Multifamily deve... | Revisions Required | Nov 20, 2024 |
| 1.7 mi | 2723 HONDO AVE | New construction, multifamily.6 dwelling units. | Inspection Phase | Nov 27, 2024 |
| 1.8 mi | 4475 SCURRY ST | New Construction of 18 unit Multifamily. | Inspection Phase | Oct 11, 2024 |
| 1.8 mi | 1701 S MALCOLM X BLVD | Q-Team Review, new Construction of two-story structure co... | Inspection Phase | Nov 18, 2021 |
| 1.8 mi | 1919 S HARWOOD ST | QTEAM MEETING 1.29.2026 (1:30 PM) 4 story multifamily apa... | Revisions Required | Dec 29, 2025 |
| 1.8 mi | 2095 S HARWOOD ST | THE PROJECT CONSISTS OF NEW CONSTRUCTION IMPROVEMENTS FOR... | Payment Due | Jul 18, 2023 |
| 1.8 mi | 2514 LUCAS DR | (1131) MULTI-FAMILY DWELLING / 5 UNIT MULTIFAMILY | Inspection Phase | Feb 24, 2025 |
| 1.8 mi | 4501 AFTON ST | Residential use | Inspection Phase | Nov 23, 2021 |
| 1.8 mi | 1900 S ERVAY ST | MANUAL CONVERSION: 1903061211 - EC, FS, FA, PL, ME, EL, G... | Inspection Phase | May 13, 2025 |
| 1.8 mi | 1000 N PEAK ST | QTEAM 1000 N Peak. New Construction of 54-unit, 3-story M... | Revisions Required | May 15, 2025 |
| 1.8 mi | 1405 SEEGAR ST | (7) four story townhomes. Site development including driv... | Revisions Required | Jun 12, 2025 |
| 1.8 mi | 1819 LEAR ST | PROJECT CONSIST OF (2) 5 UNIT 4-STORY NEW CONSTRUCTION TO... | Revisions Required | Nov 24, 2025 |
| 1.8 mi | 4609 MANETT ST | QTEAM MEETING 8.12.2025 (1:30 PM) new townhomes | Revisions Required | Jun 17, 2025 |
| 1.8 mi | 1905 CORINTH ST | QTEAM MEETING 11.6.2025 (1:30 PM) Two four story multifam... | Revisions Required | Sep 19, 2025 |
| 1.8 mi | 2314 ARROYO AVE | he proposed work includes the construction of three-story... | In Review | Sep 16, 2025 |
| 1.9 mi | 4704 MONARCH ST | Multifamily New Construction, 8 townhouses with 2 bedrooms | Inspection Phase | Apr 01, 2025 |
| 1.9 mi | 1255 ANNEX AVE | QTEAM MEETING 1.8.26 (1:30 PM) New Construction - Multifa... | Inspection Phase | Nov 24, 2025 |
| 2.0 mi | 2220 S ERVAY ST | NEW GROUND UP MULTIFAMILY DWELLING, FIVE-STORY WITH 315 A... | Payment Due | Feb 12, 2025 |
| 2.1 mi | 1722 N FITZHUGH AVE | 5 Townhome Units New Construction (Multifamily) | Plan Review | Dec 10, 2025 |
| 2.2 mi | 4918 BRYAN ST | New construction MFD, 7 dwelling units, 4918 Bryan | Inspection Phase | Jun 02, 2023 |
| 2.2 mi | 3501 ASH LN | New 293 units apartment complex with wrapping 5 story par... | Revisions Required | Aug 05, 2023 |
| 2.2 mi | 2522 MERLIN ST | NEW CONSTRUCCION MULTIFAMILY | Additional Info Required | Mar 09, 2026 |
| 2.2 mi | 909 E COLORADO BLVD | New construction multifamily. | Inspection Phase | Feb 04, 2025 |
| 2.3 mi | 2708 PARNELL ST | QTEAM MEETING TBD New Construction of 21 units of multifa... | Payment Due | Feb 18, 2026 |
| 2.3 mi | 1906 MOSER AVE | QTEAM MEETING 3.10.2026 (All Day) new multifamily constru... | Revisions Required | Jan 20, 2026 |
| 2.3 mi | 2705 CLEVELAND ST | The 2705 Cleveland project is a multi-unit urban infill r... | Payment Due | Dec 22, 2025 |
| 2.3 mi | 4618 COLUMBIA AVE | Multifamily-2 New Duplex | Application About to Expire | Dec 16, 2021 |
| 2.4 mi | 701 N LANCASTER AVE | New construction 16 condos | Payment Due | Oct 25, 2023 |
| 2.4 mi | 2829 GOULD ST | The proposed work includes the construction of three-stor... | Revisions Required | Jun 26, 2025 |
| 2.5 mi | 5601 BRYAN PKWY | QTEAM MEETING 9.3.2025 AM To build 5 unit condos - Total ... | Inspection Phase | Jun 30, 2025 |
| 2.5 mi | 4555 TRAVIS ST | QTEAM PROJECT The project is a mixed use project of appro... | Revisions Required | Aug 26, 2022 |
| 2.6 mi | 3108 SOUTH BLVD | New 5 unit multi-family dwelling. Previous permit number:... | Revisions Required | Feb 20, 2025 |
| 2.6 mi | 400 N LANCASTER AVE | New construction of 16 unit multifamily. | Inspection Phase | Jan 28, 2025 |
| 2.6 mi | 1111 N MADISON AVE | QTEAM MEETING 10.22.2025 New construction of a 4 unit condo | Inspection Phase | Aug 18, 2025 |
| 2.6 mi | 3000 SOUTH BLVD | CONSTRUCTION OF NEW TWO STORY STUDIO APARTMENTS | Revisions Required | Jan 21, 2025 |
| 2.6 mi | 4918 EAST SIDE AVE | New construction of 5-unit townhome building | Application About to Expire | Jun 28, 2024 |
| 2.7 mi | 911 E 8TH ST | QTEAM MEETING 6.5.2025 - 20 unit new construction multifa... | Payment Due | May 16, 2025 |
| 2.7 mi | 312 N LANCASTER AVE | New Construction 16 Multifamily | Payment Due | Jan 19, 2023 |
| 2.7 mi | 4777 N CENTRAL EXPY | New podium structured multifamily building with below gra... | Inspection Phase | Jul 02, 2024 |
| 2.7 mi | 4739 GRETNA ST | 18 Townhouses in 2 phases. 9 units each phase. PHASE 1 BU... | Inspection Phase | Jan 15, 2025 |
| 2.8 mi | 5946 LEWIS ST | Building 5 condos -3 story. | Revisions Required | Aug 15, 2025 |
| 2.8 mi | 5731 RICHMOND AVE | QTEAM MEETING 10.21.2025 (AM) New construction of six-uni... | Inspection Phase | Sep 23, 2025 |
| 2.9 mi | 719 N ZANG BLVD | New Construction multi family apartment | Inspection Phase | Apr 11, 2023 |
| 2.9 mi | 6001 LEWIS ST | Commercial New - Multifamily | Inspection Phase | Feb 08, 2024 |
| 2.9 mi | 6027 LA VISTA DR | Construct 5 Plex WOOD FRAMESTUCCO/SIDINGCONDOS WITH ATTAC... | Revisions Required | Sep 19, 2025 |
| 2.9 mi | 5705 LIVE OAK ST | New Construction Multifamily-5705 Live Oak | Inspection Phase | Jul 24, 2024 |
| 3.0 mi | 1510 E 11TH ST | Mixed-use residential and retail project with 204 units a... | Inspection Phase | Sep 29, 2021 |
No notes yet
No notes yet
Estimated from loan records, rental listings, and appraisal data using industry-standard assumptions.
Computed from nearby properties within 3 miles of similar vintage
No notes yet
THE CHRISTOPHER is a 2016-built, 30-story high-rise apartment tower in Dallas with 108 units across 125.9K SF of net leasable area, yielding 1,165 SF per unit—skewed toward larger floor plans typical of Class B+ urban product. Brick exterior with reinforced concrete frame construction in excellent condition; the property sits in a 95 walk score location. Project is subject to a 35% TIF arrangement. Parking details, amenity package specifics, and utility/pet policies are not disclosed in available data.
No notes yet
No notes yet
The Christopher targets an affluent urban core with exceptional rent absorption capacity but faces demand cliff beyond 1-mile radius. The 1-mile ring exhibits 87.6% renter concentration and median income of $107.4K supporting a 23.7% affordability ratio—best-in-class for luxury multifamily. However, income distribution is heavily skewed toward $100K+ earners (52.6% of households), indicating limited workforce housing upside and exposure to high-income volatility. The sharp drop to 74.1% renter occupancy and $90.5K median income at 3-miles, and further deterioration to 62.0% renters and $94.5K at 5-miles, suggests the property is positioned for a tight, affluent submarket rather than broad-based demographic tailwinds. Missing rent data prevents validation of whether current pricing fully captures this income premium.
Source: US Census ACS 5-Year Estimates (2023) · 8 tracts (1mi)
No notes yet
No notes yet
No notes yet
Appraisal History:
The property appraised at $47.6M in 2025, up 8.0% YoY, translating to $440.3K per unit—a healthy valuation for a 2016 vintage asset in a TIF district. Land represents only 7.2% of total value ($3.4M), with improvements capturing 92.8%, indicating minimal redevelopment optionality and a fully stabilized, income-focused property. Single-year data limits trend analysis, but the 8.0% appreciation suggests strong market fundamentals and likely solid NOI growth, though without prior appraisals we cannot assess whether this is recovery from a prior trough or sustained momentum.
| Year | Total Value | Change |
|---|---|---|
| 2025 | $47,551,510 | +8.0% |
No notes yet
No notes yet
No notes yet