1607 LYTE ST, DALLAS, TX, 752011633
$24,750,000
2025 Appraised Value
↑ 3.1% from prior year
PASS. Magnolia Station presents an acute refinancing crisis that overshadows operational upside: $71.8M in aggregate debt across a $24.75M appraised asset (290% LTV) with three Frost Bank facilities matured since 2018–2019 and no clear refinancing capacity in the current rate environment. While recent management transitions have improved Google ratings and the 87.4% renter concentration in the 1-mile radius supports 4.0% occupancy at $2.078K/month rent, the property's fundamental issue is overleveraged capital structure, not operational performance—chronic refinancing dependency (seven financing events since 2004, zero equity exits) indicates a distressed hold rather than a value-add acquisition. The 54.8% near-term construction pipeline will materially pressure rent growth trajectory, and one-bedroom rents have fallen 26.5% YoY ($1.788K to $1.314K) despite market rents up 11.9%, signaling tenant-level demand weakness masked by concessions. The 50% unit renovation upside and strong urban positioning (Walk Score 89) cannot offset balance-sheet toxicity and the likelihood of a forced or structured workout in the next 12–18 months; monitor for distressed listing or loan sale signals before reconsidering.
No notes yet
Vintage Soul, Modern Spirit
Enjoy the modern amenities of each one, two and three-bedroom floor plan available at Magnolia Station. The community boasts panoramic views of Victory Park and downtown Dallas from the rooftop lounge. The residences offer a spacious living area that include walk-in closets, brushed nickel finishes and stainless steel kitchen appliances. In between the Design District and Uptown, Victory Park is a trendy neighborhood that is the perfect combination of culture and entertainment. This urban area is home to some of Dallas' most popular destinations including House of Blues, the Perot Museum of Nature and Science and the American Airlines Center. Victory Park provides plenty of highly walkable spots and hosts special events throughout the year. Units are available as mid-rise or loft-style apartment homes.
Physical Condition & Renovation Status
Magnolia Station presents a mixed renovation profile inconsistent with its 2016 construction date. While 48% of analyzed units (12/25) show upgraded finishes, the remaining units retain builder-grade materials—primarily standard white/black appliances, laminate countertops, and honey oak cabinetry typical of original 2015–2016 construction. The exterior entrance upgrades (modern blue-gray doors, contemporary hardware) suggest selective common-area renovations rather than comprehensive unit repositioning. This partial upgrade pattern positions the asset as Class B-/C+ with meaningful value-add potential: a systematic unit renovation program targeting the ~50% non-upgraded units could drive meaningful NOI uplift without requiring structural capital.
/ ·
This photo was not identified as property-related.
No AI analysis available for this photo.
No notes yet
The Walk Score of 89 signals strong urban positioning, but the 69 Transit Score reveals a critical gap for car-free tenants—this C-class asset at $2.078K/month attracts price-conscious renters who disproportionately rely on personal vehicles despite walkable surroundings. The disconnect between excellent pedestrian infrastructure and moderate transit access suggests demand will track local employment density and parking availability rather than pure walkability; tenants here are likely commuting to dispersed job centers across Dallas rather than consolidating around a single downtown hub. Without amenity detail (nearby retail/dining/fitness density), the Walk Score alone may overstate actual tenant utility if the surrounding blocks lack destination mix. This profile suits workforce/essential-worker segments with car ownership and neighborhood-focused routines rather than transit-dependent professionals.
No notes yet
The 54.8% pipeline-to-inventory ratio represents material near-term pressure on Magnolia Station's rent growth and occupancy trajectory. 68 units in nearby construction against a 124-unit asset translates to roughly 35% supply growth in the immediate competitive set, with multiple projects already in inspection or late-stage permitting phases (filed Sept–Dec 2025), suggesting deliveries likely commence in 2026–2027. The permits cluster across four nearby ZIP codes (75215, 75204, 75206, 75211) rather than a single downtown corridor, indicating diluted but widespread competitive density; coupled with the submarket's deteriorating vacancy trend, this pipeline poses meaningful downside risk to achievable rents absent significant demand tailwinds or operational differentiation.
| Distance | Address | Description | Status | Filed |
|---|---|---|---|---|
| 0.2 mi | 3031 N HARWOOD ST | QTEAM MEETING 9.4.2025 3131 N Harwood For Office and 303... | Revisions Required | Jul 21, 2025 |
| 0.6 mi | 2702 MCKINNEY AVE | 2700 McKinney - 21 Story Mixed Use Tower Including Retail... | Payment Due | Jun 09, 2022 |
| 0.6 mi | 2505 TURTLE CREEK BLVD | New construction of 20-story assisted living building wit... | Inspection Phase | Aug 06, 2024 |
| 1.0 mi | 3555 DICKASON AVE | Q-Team Migrated NEW 4 LEVEL ABOVE GRADE GARAGE(1-3.5).LEV... | Payment Due | Mar 24, 2021 |
| 1.3 mi | 4013 N HALL ST | QTEAM MEETING 7.17.2025 8 unit multifamily new construction | Payment Due | Jun 17, 2025 |
| 1.3 mi | 4011 N HALL ST | QTEAM MEETING 7.22.2025 - 8 unit multifamily new construc... | Payment Due | Jun 17, 2025 |
| 1.3 mi | 4005 N HALL ST | QTEAM MEETING - 7.23.2025 - 8 unit multifamily new constr... | Payment Due | Jun 17, 2025 |
| 1.3 mi | 2013 JACKSON ST | ***Manual Recreation*** 1906051126*** - New Multifamily C... | Inspection Phase | Jul 10, 2025 |
| 1.4 mi | 3900 LEMMON AVE | New construction of MFD project. 406 dwelling units with ... | Revisions Required | Aug 21, 2024 |
| 1.4 mi | 2723 HONDO AVE | New construction, multifamily.6 dwelling units. | Inspection Phase | Nov 27, 2024 |
| 1.4 mi | 4501 AFTON ST | Residential use | Inspection Phase | Nov 23, 2021 |
| 1.4 mi | 4330 DICKASON AVE | New construction of multi-family// 4330 Dickason. | Plan Review | Jun 29, 2022 |
| 1.4 mi | 3608 SAN JACINTO ST | New residential townhomes | Inspection Phase | May 26, 2022 |
| 1.4 mi | 2811 HONDO AVE | New construction of 12 unit townhome on two lots; 6 units... | Inspection Phase | Jul 16, 2021 |
| 1.5 mi | 2514 LUCAS DR | (1131) MULTI-FAMILY DWELLING / 5 UNIT MULTIFAMILY | Inspection Phase | Feb 24, 2025 |
| 1.5 mi | 2314 ARROYO AVE | he proposed work includes the construction of three-story... | In Review | Sep 16, 2025 |
| 1.7 mi | 1714 RIPLEY ST | New construction of five townhomes. | Inspection Phase | Jun 19, 2024 |
| 1.7 mi | 1717 N PEAK ST | Commercial New construction of a 7-unit multi-family buil... | Payment Due | Feb 27, 2025 |
| 1.8 mi | 4320 SCURRY ST | Q Team for East Village II New Construction for 3 buildin... | Inspection Phase | May 19, 2022 |
| 1.8 mi | 4609 MANETT ST | QTEAM MEETING 8.12.2025 (1:30 PM) new townhomes | Revisions Required | Jun 17, 2025 |
| 1.8 mi | 4315 SCURRY ST | Q Team review for East Village New Construction for 15 -... | Inspection Phase | May 04, 2022 |
| 1.8 mi | 4315 SAN JACINTO ST | New construction of 9 units multifamily | Payment Due | Sep 17, 2024 |
| 1.8 mi | 4319 SAN JACINTO ST | New Construction 9 unit multifamily. | Inspection Phase | Sep 17, 2024 |
| 1.8 mi | 720 S GOOD LATIMER EXPY | Q Team Review New construction of a 21 level residential ... | Plan Review | Jan 31, 2023 |
| 1.9 mi | 4405 SCURRY ST | Q-Team 4405 Scurry for a New, Commercial Multifamily deve... | Revisions Required | Nov 20, 2024 |
| 1.9 mi | 4475 SCURRY ST | New Construction of 18 unit Multifamily. | Inspection Phase | Oct 11, 2024 |
| 1.9 mi | 1902 N CARROLL AVE | New Construction of 3 story 33 townhouses with garage at ... | Inspection Phase | Jul 01, 2022 |
| 2.0 mi | 4704 MONARCH ST | Multifamily New Construction, 8 townhouses with 2 bedrooms | Inspection Phase | Apr 01, 2025 |
| 2.0 mi | 1000 N PEAK ST | QTEAM 1000 N Peak. New Construction of 54-unit, 3-story M... | Revisions Required | May 15, 2025 |
| 2.0 mi | 3201 MAIN ST | QTEAM MEETING 12.3.2025 - NOT USING SB840, CONFIRMED WITH... | Application About to Expire | Oct 16, 2025 |
| 2.1 mi | 1900 S ERVAY ST | MANUAL CONVERSION: 1903061211 - EC, FS, FA, PL, ME, EL, G... | Inspection Phase | May 13, 2025 |
| 2.1 mi | 1255 ANNEX AVE | QTEAM MEETING 1.8.26 (1:30 PM) New Construction - Multifa... | Inspection Phase | Nov 24, 2025 |
| 2.1 mi | 1701 S MALCOLM X BLVD | Q-Team Review, new Construction of two-story structure co... | Inspection Phase | Nov 18, 2021 |
| 2.1 mi | 1919 S HARWOOD ST | QTEAM MEETING 1.29.2026 (1:30 PM) 4 story multifamily apa... | Revisions Required | Dec 29, 2025 |
| 2.2 mi | 1819 LEAR ST | PROJECT CONSIST OF (2) 5 UNIT 4-STORY NEW CONSTRUCTION TO... | Revisions Required | Nov 24, 2025 |
| 2.2 mi | 1405 SEEGAR ST | (7) four story townhomes. Site development including driv... | Revisions Required | Jun 12, 2025 |
| 2.2 mi | 2095 S HARWOOD ST | THE PROJECT CONSISTS OF NEW CONSTRUCTION IMPROVEMENTS FOR... | Payment Due | Jul 18, 2023 |
| 2.2 mi | 1905 CORINTH ST | QTEAM MEETING 11.6.2025 (1:30 PM) Two four story multifam... | Revisions Required | Sep 19, 2025 |
| 2.2 mi | 1722 N FITZHUGH AVE | 5 Townhome Units New Construction (Multifamily) | Plan Review | Dec 10, 2025 |
| 2.3 mi | 4918 BRYAN ST | New construction MFD, 7 dwelling units, 4918 Bryan | Inspection Phase | Jun 02, 2023 |
| 2.3 mi | 909 E COLORADO BLVD | New construction multifamily. | Inspection Phase | Feb 04, 2025 |
| 2.3 mi | 2220 S ERVAY ST | NEW GROUND UP MULTIFAMILY DWELLING, FIVE-STORY WITH 315 A... | Payment Due | Feb 12, 2025 |
| 2.4 mi | 4739 GRETNA ST | 18 Townhouses in 2 phases. 9 units each phase. PHASE 1 BU... | Inspection Phase | Jan 15, 2025 |
| 2.4 mi | 4555 TRAVIS ST | QTEAM PROJECT The project is a mixed use project of appro... | Revisions Required | Aug 26, 2022 |
| 2.4 mi | 1906 MOSER AVE | QTEAM MEETING 3.10.2026 (All Day) new multifamily constru... | Revisions Required | Jan 20, 2026 |
| 2.5 mi | 701 N LANCASTER AVE | New construction 16 condos | Payment Due | Oct 25, 2023 |
| 2.5 mi | 2522 MERLIN ST | NEW CONSTRUCCION MULTIFAMILY | Additional Info Required | Mar 09, 2026 |
| 2.6 mi | 3501 ASH LN | New 293 units apartment complex with wrapping 5 story par... | Revisions Required | Aug 05, 2023 |
| 2.6 mi | 4618 COLUMBIA AVE | Multifamily-2 New Duplex | Application About to Expire | Dec 16, 2021 |
| 2.6 mi | 5601 BRYAN PKWY | QTEAM MEETING 9.3.2025 AM To build 5 unit condos - Total ... | Inspection Phase | Jun 30, 2025 |
| 2.7 mi | 4777 N CENTRAL EXPY | New podium structured multifamily building with below gra... | Inspection Phase | Jul 02, 2024 |
| 2.7 mi | 2708 PARNELL ST | QTEAM MEETING TBD New Construction of 21 units of multifa... | Payment Due | Feb 18, 2026 |
| 2.7 mi | 2710 KIMSEY DR | New MFD project for a 3 story 5 unit townhome apartment c... | Plan Review | Jan 22, 2025 |
| 2.7 mi | 2705 CLEVELAND ST | The 2705 Cleveland project is a multi-unit urban infill r... | Payment Due | Dec 22, 2025 |
| 2.7 mi | 2702 KIMSEY DR | THE ASTRID APARTMENTS PROJECT WILL BE A NEW, THREE-STORY ... | In Review | Aug 29, 2025 |
| 2.7 mi | 1111 N MADISON AVE | QTEAM MEETING 10.22.2025 New construction of a 4 unit condo | Inspection Phase | Aug 18, 2025 |
| 2.8 mi | 2829 GOULD ST | The proposed work includes the construction of three-stor... | Revisions Required | Jun 26, 2025 |
| 2.8 mi | 3700 INWOOD RD | QTEAM MEETING Senior Living community with independent li... | Inspection Phase | May 28, 2025 |
| 2.8 mi | 400 N LANCASTER AVE | New construction of 16 unit multifamily. | Inspection Phase | Jan 28, 2025 |
| 2.8 mi | 4918 EAST SIDE AVE | New construction of 5-unit townhome building | Application About to Expire | Jun 28, 2024 |
| 2.9 mi | 911 E 8TH ST | QTEAM MEETING 6.5.2025 - 20 unit new construction multifa... | Payment Due | May 16, 2025 |
| 2.9 mi | 312 N LANCASTER AVE | New Construction 16 Multifamily | Payment Due | Jan 19, 2023 |
| 2.9 mi | 5731 RICHMOND AVE | QTEAM MEETING 10.21.2025 (AM) New construction of six-uni... | Inspection Phase | Sep 23, 2025 |
| 2.9 mi | 3000 SOUTH BLVD | CONSTRUCTION OF NEW TWO STORY STUDIO APARTMENTS | Revisions Required | Jan 21, 2025 |
| 3.0 mi | 5946 LEWIS ST | Building 5 condos -3 story. | Revisions Required | Aug 15, 2025 |
| 3.0 mi | 3108 SOUTH BLVD | New 5 unit multi-family dwelling. Previous permit number:... | Revisions Required | Feb 20, 2025 |
| 3.0 mi | 719 N ZANG BLVD | New Construction multi family apartment | Inspection Phase | Apr 11, 2023 |
| 3.0 mi | 5115 MCKINNEY AVE | New construction of mixed use building.90 multifamily uni... | Plan Review | Jul 16, 2023 |
No notes yet
Refinancing risk is acute. The property carries $71.8M in aggregate debt across six loans—$579.4K per unit against a $224.4K/unit appraised value, creating a loan-to-value of 290% that is unrealistic and suggests data quality issues or stacked/cross-collateralized structures. More critically, three Frost Bank loans originated in 2018–2019 with 12-month terms are likely matured or in extension, and the UC Funding line ($50K, 36-month term from June 2019) has also expired. Only the GSF Lender note ($18.4M, Nov 2021) has a clear origination date within the last three years. The ownership history shows seven refinancing events since 2004 with no actual equity sales—exclusively financing transactions and modifications—suggesting chronic leverage dependency rather than strategic exits. Absentee corporate ownership combined with matured debt, overleveraged capital structure, and transaction velocity indicates either a distressed hold-to-maturity situation or a highly leveraged value-add play with significant refinancing uncertainty at current rate environment.
No notes yet
Magnolia Station trades at a 77 bps premium to submarket cap (5.33% vs. 5.03%), pricing in either above-market operations or value-add upside. The $228K/unit ask sits 19.3% above submarket comparables ($191K), a gap that narrows only if NOI grows materially or expense management improves beyond the 50% opex ratio—reasonable for Class C but leaving limited margin for error. The $3.6M spread between appraised ($24.75M) and estimated sale price ($28.3M) signals either conservative appraisal methodology or seller confidence in near-term rent growth; absent documented recent renovations or lease-up acceleration, this delta warrants reconciliation. At $12.2K NOI/unit, the property performs in line with stabilized Class B/C Dallas multifamily, not distressed value-add.
Estimated from loan records, rental listings, and appraisal data using industry-standard assumptions.
Based on most recent loan: $18,400,000 (Nov 2021, attom)
Computed from nearby properties within 3 miles of similar vintage
No notes yet
Magnolia Station is a 124-unit, mid-rise apartment community built in 2016 with wood-frame construction and brick exterior, classified as 50% C-Class despite excellent condition ratings. The five-story, 58.2K sf building offers one-, two-, and three-bedroom units with stainless steel appliances, brushed nickel finishes, and walk-in closets, plus rooftop lounge, pool, fitness center, and outdoor fire pit/gazebo amenities. Located in Victory Park between the Design District and Uptown, the property commands a 89 walk score and 4.0 Google rating. Parking type and utility inclusions are not specified in available data.
No notes yet
Magnolia Station is aggressively discounting to move inventory. Availability spiked to 5 units (4.0% of 124) as of March 25 with 6 weeks free rent offered—a material concession signaling tenant acquisition pressure despite submarket rents up 11.9%. Two-bedroom asking rents ($2.46M) exceed market benchmarks ($2.354M) by 0.6%, but one-bedrooms ($1.314M) lag market by $446 (25.3%), suggesting the property is pricing out of the weaker unit class to offset leasing friction. Recent one-bedroom pricing history shows a cliff: rents declined from $1.788M (April 2024) to $1.314M (Feb 2026), indicating sustained downward pressure on smaller units that concessions alone haven't resolved.
Estimated from listed vacancies vs total units
Min/avg/max asking rents from property website
| Unit | Beds | Baths | Sqft | Rent | Status | Listed | Days |
|---|---|---|---|---|---|---|---|
| 2BR | 2 | 1,017 | $2,470 | Active | Mar 25 | — | |
|
Mar $2,470
|
|||||||
| 2BR | 2 | 1,017 | $2,450 | Active | Mar 25 | — | |
|
Mar $2,450
|
|||||||
| 1BR | 1 | 580 | $1,314 | Active | Feb 6 | 60 | |
|
Apr $1,788
→
Feb $1,314
(↓26.5%)
|
|||||||
| 1BR | 1 | 460 | $1,700 | Inactive | Sep 17 | 71 | |
|
Sep $1,700
|
|||||||
| Vault | 2BR | 2 | 1,350 | — | Inactive | Mar 25 | — |
| B2 | 2BR | 2 | 1,089 | — | Inactive | Mar 25 | — |
| B2.1 | 2BR | 2 | 1,089 | — | Inactive | Mar 25 | — |
No notes yet
Affluent urban core with strong affordability despite premium positioning. The 1-mile radius median household income of $109.1K supports the $2,078 rent (23.5% affordability ratio), and 33.3% of households earn $150K+, indicating this is a high-income renter market rather than workforce housing. However, demand weakens materially at distance: the 3-mile radius shows 73.7% renter concentration versus 87.4% at 1-mile, and affordability deteriorates to 20.2% by the 5-mile ring where household size increases to 2.2 (suburban family migration). The sharp drop in $150K+ earners (33.3% → 26.9% → 26.6%) and rise in sub-$50K households (17.1% → 25.5% → 29.8%) as radius expands suggests limited geographic depth of affluent renters; this property is highly dependent on the immediate urban core's density and income concentration. The 87.4% renter rate in the 1-mile radius is exceptionally strong and signals deep demand, but the tightening affordability ratio and income skew toward the top quintile imply limited upside to rent growth without risk to occupancy.
Source: US Census ACS 5-Year Estimates (2023) · 8 tracts (1mi)
No notes yet
Data Quality Issue — Unit Mix Unreconcilable. The property claims 124 total units but only 3 units appear in the bedroom breakdown (1 one-bedroom, 2 two-bedrooms), leaving 121 units unaccounted for. This dataset is incomplete and insufficient for meaningful unit mix analysis; acquisition due diligence would require full unit count by bedroom type before proceeding with underwriting.
Estimated from 2 listed units (1.6% of 124 total)
No notes yet
No notes yet
Appraisal Analysis – Magnolia Station
The property is severely overvalued on the land component at $186.2K per unit against a $13.4K per-unit improvement basis, signaling either a distressed appraisal or land-heavy accounting that disconnects from the 2016 Class C structure. The 3.1% YoY appreciation to $24.75M provides no downside cushion in a flat multifamily market and lacks sufficient historical appraisals to establish trend confidence. The 93.3% land-to-value ratio is atypical for stabilized multifamily and suggests either a major refinance underwriting error or a repositioning/redevelopment play that the data alone cannot validate.
| Year | Total Value | Change |
|---|---|---|
| 2025 | $24,750,000 | +3.1% |
No notes yet
Management transitions have driven a sharp recent recovery, but historical operational issues remain a risk flag. The property shows a bimodal distribution—40 five-star reviews (62.5% of total) clustered in the last 18 months under managers Desiree, Tru, and Becki, versus 12 one-star reviews concentrated in 2024-mid-2025 citing maintenance delays, pest infestation (mites), water intrusion, and security lapses. The 4.7 rating in the last 6 months versus 4.0 overall suggests genuine operational improvement, likely driven by management replacement, but the persistence of detailed complaints about deferred maintenance and pest control in mid-2024 indicates these were systemic rather than isolated incidents. For a C-class 124-unit asset, the strong recent trajectory under new leadership is a positive signal, but underwriting should stress-test remediation costs and verify that capital improvements have actually addressed the infrastructure and pest control gaps documented in the 2024 reviews.
60 reviews total
My girl Tru is the truth! If you have any questions about the property she has the answers. We are finishing up our first year here! Everyone is friendly from residents to staff. You have to tour the place if there are any units available!!
We came in and viewed beautiful apartment homes with the manager Tru. Wow talk about someone who knew and understood exactly what we explained that we wanted and matched us perfectly! She was so personable and not cold unlike most in the industry. 10/10 reccomend
Had a phenomenal tour with my locator. But when I found out Tru is the new Property Manager it all made sense! Highly recommended this property!
I've lived here for several months and I'd give Magnolia Station 3/5 stars. I'm happy with my unit and love the neighborhood but wouldn't live here long term.
Pros
- Huge balcony with a beautiful view
- Natural sunlit, spacious/airy apartment and the price is on the cheaper side for this neighborhood (I wouldn't live here for $1800 but it's affordable with a rent special)
- Location: Right next to Katy Trail, CVS, Tom Thumb, 5 min drive downtown, etc.
- Quiet and nice neighbors
- Parking is pretty good and I haven't had an issue with a car break in
Cons (many)
- Management is a mess! There have been 4 replacements within the last 6 months. What is going on?
- If you live in the H building, packages get delivered to the wrong address frequently
- Amenities are 1/5. Gym is dusty, would not use that pool, the elevator smells like wet dog at all times
- There are centipedes in the summer (July-Aug) not sure where they come from but they're everywhere and then disappear in the fall/winter
- Maintenance requests take forever (several weeks) if you need something replaced
- The neighborhood is pretty safe but security here is non-existent
- You have to get out of your car to open the gate. Very ridiculous.
- Traffic during a game/event at the American Airlines Center is insane sometimes they block entrances to get into the street that leads to the apartment
- Occasionally at night and sometimes during the day, unhoused people sleep outside of the front entrance. They don't bother anyone but putting this out for awareness
No notes yet
No notes yet