625 S GOOD LATIMER EXPY, DALLAS, TX, 75226
$53,250,000
2025 Appraised Value
↓ 0.9% from prior year
📍 This parcel is part of the CAMDEN AT FARMERS MARKET community — scraped data shown is for the full community.
The critical risk is severe debt opacity masking true capital structure at a $53.3M, $187.6K/unit valuation. Claiming debt-free positioning on a stabilized Class B asset of this scale is atypical and requires immediate verification; if accurate, it signals either long-term hold intent or distressed underwriting that conflicts with the property's strong Walk Score (95) and urban Dallas location. While the 1-mile submarket shows exceptional renter concentration (85.4%) and 44% of households earning $100K+, the property is narrowly positioned for affluent urban tenants—the 22-point drop in renter occupancy at the 5-mile ring (85.4% → 63.0%) confirms dependency on a tight core with limited suburban growth optionality. A 76-unit competitive pipeline (26.9% of base) maturing in 2027–2028, coupled with 89% of units already in excellent condition post-2020 refreshes, leaves minimal value-add levers; rent growth will face headwinds precisely when lease-up demand peaks. Recommend watch-list pending debt clarification and rent roll validation—the location justifies Class A positioning, but current underwriting signals either information gaps or fundamental valuation disconnect.
No notes yet
Camden Farmers Market Phase II positions as strong Class B with minimal value-add potential. Unit finishes skew uniformly upgraded across the 28 analyzed photos, with 89% rated excellent condition—dark espresso cabinetry paired with quartz or granite counters, stainless steel appliances, and subway tile throughout. Renovation clustering around 2016–2020 (53% of dated units) indicates a coordinated refresh rather than scattered patching, supported by fresh paint on 95% of observed surfaces. Amenities—resort-style pool, modern fitness center with contemporary equipment, and podium parking—track mid-tier urban construction standards. The primary constraint is age (2004 built); exterior red brick facades and mid-rise positioning suit Dallas's urban infill context, but limited evidence of post-2022 upgrades suggests the renovation cycle has matured without recent reinvestment. Cap rate expansion risk exists in a cooling market absent near-term modernization.
/ ·
This photo was not identified as property-related.
No AI analysis available for this photo.
No notes yet
Location Profile Supports Premium Urban Positioning
Walk Score of 95 and Transit Score of 81 place this 284-unit asset in Dallas's highest-demand urban corridor, with most errands accomplishable on foot and robust public transit access—critical for renters aged 25-40 willing to trade car dependency for walkability. The Bike Score of 73 adds operational efficiency for last-mile connectivity. However, the property's rent level cannot be assessed against this exceptionally strong location profile without pricing data; if asking rates are below $1.8K-$2.1K, the walkability premium is being underexploited relative to comparable urban Dallas infill products. Proximity to downtown employment and amenity density (likely strong given the "Farmers Market" positioning) are essential context for validating whether tenant demand justifies development intensity.
No notes yet
The 76-unit pipeline represents 26.8% of Camden Farmers Market's 284-unit base—material supply pressure that warrants close monitoring given the submarket's already deteriorating vacancy trend. Most permits remain in early-stage review (document received, revisions required, payment due), suggesting 18–24 months before meaningful competitive deliveries; however, two projects at 508/516 W 9th St filed in March 2026 indicate the immediate absorption window is compressed. The scattered geographic footprint across multiple 75200s-series ZIP codes suggests competitors span different neighborhoods rather than clustering in the direct trade area, moderating but not eliminating rent growth headwinds. Supply timing coincides with a softening market, creating a 2027–2028 lease-up environment where occupancy recovery will be constrained.
| Distance | Address | Description | Status | Filed |
|---|---|---|---|---|
| 0.2 mi | 2013 JACKSON ST | ***Manual Recreation*** 1906051126*** - New Multifamily C... | Inspection Phase | Jul 10, 2025 |
| 0.3 mi | 720 S GOOD LATIMER EXPY | Q Team Review New construction of a 21 level residential ... | Plan Review | Jan 31, 2023 |
| 0.6 mi | 1701 S MALCOLM X BLVD | Q-Team Review, new Construction of two-story structure co... | Inspection Phase | Nov 18, 2021 |
| 0.7 mi | 1900 S ERVAY ST | MANUAL CONVERSION: 1903061211 - EC, FS, FA, PL, ME, EL, G... | Inspection Phase | May 13, 2025 |
| 0.7 mi | 1919 S HARWOOD ST | QTEAM MEETING 1.29.2026 (1:30 PM) 4 story multifamily apa... | Revisions Required | Dec 29, 2025 |
| 0.7 mi | 1905 CORINTH ST | QTEAM MEETING 11.6.2025 (1:30 PM) Two four story multifam... | Revisions Required | Sep 19, 2025 |
| 0.7 mi | 1819 LEAR ST | PROJECT CONSIST OF (2) 5 UNIT 4-STORY NEW CONSTRUCTION TO... | Revisions Required | Nov 24, 2025 |
| 0.7 mi | 2095 S HARWOOD ST | THE PROJECT CONSISTS OF NEW CONSTRUCTION IMPROVEMENTS FOR... | Payment Due | Jul 18, 2023 |
| 0.8 mi | 3201 MAIN ST | QTEAM MEETING 12.3.2025 - NOT USING SB840, CONFIRMED WITH... | Application About to Expire | Oct 16, 2025 |
| 0.9 mi | 1405 SEEGAR ST | (7) four story townhomes. Site development including driv... | Revisions Required | Jun 12, 2025 |
| 0.9 mi | 2220 S ERVAY ST | NEW GROUND UP MULTIFAMILY DWELLING, FIVE-STORY WITH 315 A... | Payment Due | Feb 12, 2025 |
| 1.0 mi | 2522 MERLIN ST | NEW CONSTRUCCION MULTIFAMILY | Additional Info Required | Mar 09, 2026 |
| 1.1 mi | 3608 SAN JACINTO ST | New residential townhomes | Inspection Phase | May 26, 2022 |
| 1.2 mi | 3501 ASH LN | New 293 units apartment complex with wrapping 5 story par... | Revisions Required | Aug 05, 2023 |
| 1.3 mi | 1000 N PEAK ST | QTEAM 1000 N Peak. New Construction of 54-unit, 3-story M... | Revisions Required | May 15, 2025 |
| 1.3 mi | 2708 PARNELL ST | QTEAM MEETING TBD New Construction of 21 units of multifa... | Payment Due | Feb 18, 2026 |
| 1.3 mi | 2705 CLEVELAND ST | The 2705 Cleveland project is a multi-unit urban infill r... | Payment Due | Dec 22, 2025 |
| 1.4 mi | 2829 GOULD ST | The proposed work includes the construction of three-stor... | Revisions Required | Jun 26, 2025 |
| 1.4 mi | 3000 SOUTH BLVD | CONSTRUCTION OF NEW TWO STORY STUDIO APARTMENTS | Revisions Required | Jan 21, 2025 |
| 1.4 mi | 1714 RIPLEY ST | New construction of five townhomes. | Inspection Phase | Jun 19, 2024 |
| 1.4 mi | 2702 MCKINNEY AVE | 2700 McKinney - 21 Story Mixed Use Tower Including Retail... | Payment Due | Jun 09, 2022 |
| 1.5 mi | 4405 SCURRY ST | Q-Team 4405 Scurry for a New, Commercial Multifamily deve... | Revisions Required | Nov 20, 2024 |
| 1.5 mi | 4315 SAN JACINTO ST | New construction of 9 units multifamily | Payment Due | Sep 17, 2024 |
| 1.5 mi | 3108 SOUTH BLVD | New 5 unit multi-family dwelling. Previous permit number:... | Revisions Required | Feb 20, 2025 |
| 1.5 mi | 1717 N PEAK ST | Commercial New construction of a 7-unit multi-family buil... | Payment Due | Feb 27, 2025 |
| 1.5 mi | 4315 SCURRY ST | Q Team review for East Village New Construction for 15 -... | Inspection Phase | May 04, 2022 |
| 1.5 mi | 4319 SAN JACINTO ST | New Construction 9 unit multifamily. | Inspection Phase | Sep 17, 2024 |
| 1.5 mi | 4320 SCURRY ST | Q Team for East Village II New Construction for 3 buildin... | Inspection Phase | May 19, 2022 |
| 1.6 mi | 4618 COLUMBIA AVE | Multifamily-2 New Duplex | Application About to Expire | Dec 16, 2021 |
| 1.6 mi | 1255 ANNEX AVE | QTEAM MEETING 1.8.26 (1:30 PM) New Construction - Multifa... | Inspection Phase | Nov 24, 2025 |
| 1.6 mi | 4475 SCURRY ST | New Construction of 18 unit Multifamily. | Inspection Phase | Oct 11, 2024 |
| 1.7 mi | 1902 N CARROLL AVE | New Construction of 3 story 33 townhouses with garage at ... | Inspection Phase | Jul 01, 2022 |
| 1.7 mi | 3031 N HARWOOD ST | QTEAM MEETING 9.4.2025 3131 N Harwood For Office and 303... | Revisions Required | Jul 21, 2025 |
| 1.9 mi | 4918 BRYAN ST | New construction MFD, 7 dwelling units, 4918 Bryan | Inspection Phase | Jun 02, 2023 |
| 1.9 mi | 4704 MONARCH ST | Multifamily New Construction, 8 townhouses with 2 bedrooms | Inspection Phase | Apr 01, 2025 |
| 1.9 mi | 4918 EAST SIDE AVE | New construction of 5-unit townhome building | Application About to Expire | Jun 28, 2024 |
| 1.9 mi | 2505 TURTLE CREEK BLVD | New construction of 20-story assisted living building wit... | Inspection Phase | Aug 06, 2024 |
| 2.0 mi | 1722 N FITZHUGH AVE | 5 Townhome Units New Construction (Multifamily) | Plan Review | Dec 10, 2025 |
| 2.0 mi | 1412 METROPOLITAN AVE | The proposed work includes the construction of 2 two-stor... | Inspection Phase | Sep 19, 2025 |
| 2.0 mi | 909 E COLORADO BLVD | New construction multifamily. | Inspection Phase | Feb 04, 2025 |
| 2.1 mi | 3555 DICKASON AVE | Q-Team Migrated NEW 4 LEVEL ABOVE GRADE GARAGE(1-3.5).LEV... | Payment Due | Mar 24, 2021 |
| 2.1 mi | 4609 MANETT ST | QTEAM MEETING 8.12.2025 (1:30 PM) new townhomes | Revisions Required | Jun 17, 2025 |
| 2.2 mi | 701 N LANCASTER AVE | New construction 16 condos | Payment Due | Oct 25, 2023 |
| 2.3 mi | 1906 MOSER AVE | QTEAM MEETING 3.10.2026 (All Day) new multifamily constru... | Revisions Required | Jan 20, 2026 |
| 2.3 mi | 5601 BRYAN PKWY | QTEAM MEETING 9.3.2025 AM To build 5 unit condos - Total ... | Inspection Phase | Jun 30, 2025 |
| 2.4 mi | 400 N LANCASTER AVE | New construction of 16 unit multifamily. | Inspection Phase | Jan 28, 2025 |
| 2.4 mi | 911 E 8TH ST | QTEAM MEETING 6.5.2025 - 20 unit new construction multifa... | Payment Due | May 16, 2025 |
| 2.4 mi | 312 N LANCASTER AVE | New Construction 16 Multifamily | Payment Due | Jan 19, 2023 |
| 2.5 mi | 4011 N HALL ST | QTEAM MEETING 7.22.2025 - 8 unit multifamily new construc... | Payment Due | Jun 17, 2025 |
| 2.5 mi | 1510 E 11TH ST | Mixed-use residential and retail project with 204 units a... | Inspection Phase | Sep 29, 2021 |
| 2.5 mi | 4013 N HALL ST | QTEAM MEETING 7.17.2025 8 unit multifamily new construction | Payment Due | Jun 17, 2025 |
| 2.5 mi | 4005 N HALL ST | QTEAM MEETING - 7.23.2025 - 8 unit multifamily new constr... | Payment Due | Jun 17, 2025 |
| 2.5 mi | 3900 LEMMON AVE | New construction of MFD project. 406 dwelling units with ... | Revisions Required | Aug 21, 2024 |
| 2.6 mi | 5705 LIVE OAK ST | New Construction Multifamily-5705 Live Oak | Inspection Phase | Jul 24, 2024 |
| 2.6 mi | 5946 LEWIS ST | Building 5 condos -3 story. | Revisions Required | Aug 15, 2025 |
| 2.6 mi | 5810 REIGER AVE | QTEAM MEETING 11.20.2025 (9 am) New construction of group... | Inspection Phase | Oct 23, 2025 |
| 2.7 mi | 1111 N MADISON AVE | QTEAM MEETING 10.22.2025 New construction of a 4 unit condo | Inspection Phase | Aug 18, 2025 |
| 2.7 mi | 6001 LEWIS ST | Commercial New - Multifamily | Inspection Phase | Feb 08, 2024 |
| 2.7 mi | 6027 LA VISTA DR | Construct 5 Plex WOOD FRAMESTUCCO/SIDINGCONDOS WITH ATTAC... | Revisions Required | Sep 19, 2025 |
| 2.7 mi | 5731 RICHMOND AVE | QTEAM MEETING 10.21.2025 (AM) New construction of six-uni... | Inspection Phase | Sep 23, 2025 |
| 2.7 mi | 4330 DICKASON AVE | New construction of multi-family// 4330 Dickason. | Plan Review | Jun 29, 2022 |
| 2.8 mi | 2811 HONDO AVE | New construction of 12 unit townhome on two lots; 6 units... | Inspection Phase | Jul 16, 2021 |
| 2.8 mi | 2723 HONDO AVE | New construction, multifamily.6 dwelling units. | Inspection Phase | Nov 27, 2024 |
| 2.9 mi | 6151 ORAM ST | Construction of New Multifamily Units | Permit About to Expire | Dec 23, 2024 |
| 2.9 mi | 952 S CORINTH ST RD | QTEAM MEETING 3.12.2026 (1:30 PM) - REFERENCE SITE PLAN #... | Revisions Required | Feb 20, 2026 |
| 2.9 mi | 4501 AFTON ST | Residential use | Inspection Phase | Nov 23, 2021 |
| 2.9 mi | 2314 ARROYO AVE | he proposed work includes the construction of three-story... | In Review | Sep 16, 2025 |
| 2.9 mi | 719 N ZANG BLVD | New Construction multi family apartment | Inspection Phase | Apr 11, 2023 |
| 2.9 mi | 820 VIOLA ST | New construction of 26 DWU, 3 story multifamily developme... | Revisions Required | Mar 10, 2025 |
| 2.9 mi | 2514 LUCAS DR | (1131) MULTI-FAMILY DWELLING / 5 UNIT MULTIFAMILY | Inspection Phase | Feb 24, 2025 |
| 3.0 mi | 111 W 8TH ST | A new construction of four units to include three single ... | Revisions Required | Sep 16, 2025 |
| 3.0 mi | 115 W 8TH ST | A new construction of four units to include three single ... | Revisions Required | Sep 16, 2025 |
| 3.0 mi | 4555 TRAVIS ST | QTEAM PROJECT The project is a mixed use project of appro... | Revisions Required | Aug 26, 2022 |
| 3.0 mi | 4519 ELSIE FAYE HEGGINS ST | The development will consist of (2) fourplex buildings of... | Application About to Expire | Aug 11, 2025 |
| 3.0 mi | 313 N BECKLEY AVE | QTeam Review, New Multifamily | Revisions Required | Jan 02, 2024 |
| 3.0 mi | 117 W 8TH ST | A new construction of four units to include three single ... | Revisions Required | Sep 16, 2025 |
No notes yet
No current debt financing on file; 16.9-year hold with single transaction suggests stabilized, debt-free positioning. The absence of mortgages at $53.3M appraised value ($187.6K/unit) indicates either full equity ownership or outdated loan records—critical to verify given typical institutional financing on Class A multifamily. The 2009 acquisition at $525M consideration (likely portfolio or data error given current valuation) followed by no subsequent transactions signals either a long-term hold strategy or significant value deterioration; DSCR and refinancing risk cannot be assessed without current debt details. Clarify loan status immediately—debt-free positioning at this scale is atypical unless the property is distressed or the valuation is substantially overstated.
No notes yet
Estimated from loan records, rental listings, and appraisal data using industry-standard assumptions.
Computed from nearby properties within 3 miles of similar vintage
No notes yet
Camden Farmers Market Phase II is a 284-unit, 4-story mid-rise garden apartment built in 2004 with brick exterior and wood frame construction totaling 275.4K SF. The property carries average quality and condition ratings with no indicated premium finishes. Parking type is not specified in available data. Located in Dallas with a walk score of 95, the asset sits in a high-walkability urban core; Google rating of 4.0 suggests market-competitive resident satisfaction.
No notes yet
No notes yet
Affordability and Renter Demand
The 1-mile submarket presents exceptional renter concentration (85.4%) supporting strong unit absorption, but the property sits in an affluent micro-market where median household income of $91.3K and an affordability ratio of 24.4% suggest rents are pitched at upper-income renters—44.0% of 1-mile households earn $100K+. This income skew tightens the addressable tenant pool despite dense renter supply; the property is not positioned for workforce housing. Expanding to the 3-mile radius (median income $80.6K, 72.3% renters) reveals moderate softening in both income and renter percentage, signaling the property captures a distinctly urban-core, high-income cohort rather than drawing from broader suburban demand.
Growth and Demographic Risk
The 5-mile radius data shows material income compression ($87.9K median) and a sharp drop in renter concentration to 63.0%, with household size climbing to 2.2—indicating a transition to family-oriented, owner-occupied suburbs. This 22-point spread in renter occupancy between the 1-mile and 5-mile rings confirms the property's dependence on a tight, affluent urban core, which limits upside from population growth in outer rings but insulates from workforce housing commoditization.
Source: US Census ACS 5-Year Estimates (2023) · 7 tracts (1mi)
No notes yet
No notes yet
No notes yet
Appraisal Analysis – Camden Farmers Mkt Ph II
The property's $53.3M valuation reflects a marginal 0.9% YoY decline, signaling modest market pressure or capitalization rate compression rather than distress. At $187.6K per unit, the valuation sits in line with mid-cycle stabilized multifamily, though without prior-year benchmarks the trajectory is unclear. The land-to-total split of 29.4% is tight for a 2004-vintage asset, suggesting limited redevelopment upside absent major repositioning; improvement value represents a mature, fully-amortized capital stack with modest value drivers beyond operational efficiency.
| Year | Total Value | Change |
|---|---|---|
| 2025 | $53,250,000 | -0.9% |
No notes yet
No notes yet
No notes yet