4712 COLE AVE, DALLAS, TX, 752053556
$26,916,060
2025 Appraised Value
↑ 7.6% from prior year
📍 This parcel is part of the CARRARA AT COLE community — scraped data shown is for the full community.
The 170% LTV against a $26.9M appraisal signals distressed capital structure masking modest operating fundamentals. Current debt of $45.8M and a Dec 2018 MetLife loan with opaque terms create acute refinancing risk; the $65.4M asking price appears aspirational relative to appraised value, suggesting seller motivation despite eight years of hold-and-refi activity. Demographically, the property targets a narrow affluent core (40.8% of 1-mile households earn $150K+) with limited expansion into broader workforce housing, and a 43.1% pipeline-to-base ratio poses material near-term competitive pressure. Unit finishes are solid (Class B+ post-2020 renovation, no deferred maintenance observed), but the substantial land value ($19.7M, 74% of appraisal) and constrained trade area—Walk Score 91 but Transit Score 35, limiting appeal absent car ownership—leave minimal upside beyond current repositioned state. Pass unless acquisition price anchors to low-$20M range with clear debt restructuring; otherwise, monitor as distressed sale candidate in 12–18 months if refinance window closes.
No notes yet
Interior Finishes: Consistent mid-to-premium renovation across 2016–2020 window. Kitchens feature white quartz countertops (11 of 12 observed), stainless steel appliances (builder-to-mid-range tier), and dark espresso or cherry cabinetry in raised-panel/slab styles—standard for 2018 repositioning. Vinyl plank flooring dominates (16 units), with subway tile backsplashes and recessed lighting throughout. Bathrooms mirror kitchen quality: quartz or granite vanities, frameless glass enclosures, dual vanities in select units. No deferred maintenance or dated finishes observed across 37 photos analyzed.
Unit consistency signals complete renovation rather than piecemeal upgrades. 36 of 37 photo observations flagged "excellent" condition; 24 images dated to 2016–2020 renovation period suggests property underwent systematic unit refresh post-2015. Fresh paint (25 observations) and professional architectural lighting in common areas reinforce capital investment discipline.
Class B+ positioning with strong amenity package. Contemporary mid-rise architecture, resort-style pool with spa, modern fitness center with cardio and free weight mix, and pergola-anchored courtyard position the asset above garden-variety Class B. Built 1995 but substantially repositioned, positioning Carrara at Cole as infill value-add play with limited upside remaining—primary value captured in 2016–2020 renovations.
/ ·
This photo was not identified as property-related.
No AI analysis available for this photo.
No notes yet
Location & Walkability Analysis: Carrara at Cole
Walk Score of 91 signals genuine urban density—most errands accomplishable on foot, which commands tenant premiums in Dallas's competitive markets. However, Transit Score of 35 reveals a critical constraint: this asset lacks meaningful public transportation connectivity, making car ownership effectively mandatory despite walkable neighborhood amenities. The 83 Bike Score partially offsets transit weakness for short-distance trips but won't move the needle for renters without personal vehicles. Without rent data and proximity metrics to downtown/employment centers, we can't confirm whether the location justifies pricing in an increasingly transit-conscious Dallas submarket.
No notes yet
The 50-unit pipeline represents 43.1% of Carrara's 116-unit base, a material competitive threat in a deteriorating submarket vacancy environment. Most permits remain in early-stage review or revision cycles (filed Q3 2025–Q1 2026), suggesting staggered deliveries over 12–24 months rather than a concentrated supply shock. However, the absence of unit counts across individual permits obscures whether competitive overlap is direct (same 75206/75204 zip codes) or dispersed across Dallas submarkets—clarification needed on which projects target the same rent/demographic profile as this asset.
| Distance | Address | Description | Status | Filed |
|---|---|---|---|---|
| 0.2 mi | 4777 N CENTRAL EXPY | New podium structured multifamily building with below gra... | Inspection Phase | Jul 02, 2024 |
| 0.2 mi | 4555 TRAVIS ST | QTEAM PROJECT The project is a mixed use project of appro... | Revisions Required | Aug 26, 2022 |
| 0.4 mi | 5115 MCKINNEY AVE | New construction of mixed use building.90 multifamily uni... | Plan Review | Jul 16, 2023 |
| 1.0 mi | 4609 MANETT ST | QTEAM MEETING 8.12.2025 (1:30 PM) new townhomes | Revisions Required | Jun 17, 2025 |
| 1.3 mi | 3900 LEMMON AVE | New construction of MFD project. 406 dwelling units with ... | Revisions Required | Aug 21, 2024 |
| 1.3 mi | 5731 RICHMOND AVE | QTEAM MEETING 10.21.2025 (AM) New construction of six-uni... | Inspection Phase | Sep 23, 2025 |
| 1.3 mi | 1906 MOSER AVE | QTEAM MEETING 3.10.2026 (All Day) new multifamily constru... | Revisions Required | Jan 20, 2026 |
| 1.4 mi | 1722 N FITZHUGH AVE | 5 Townhome Units New Construction (Multifamily) | Plan Review | Dec 10, 2025 |
| 1.4 mi | 4704 MONARCH ST | Multifamily New Construction, 8 townhouses with 2 bedrooms | Inspection Phase | Apr 01, 2025 |
| 1.5 mi | 1902 N CARROLL AVE | New Construction of 3 story 33 townhouses with garage at ... | Inspection Phase | Jul 01, 2022 |
| 1.5 mi | 4005 N HALL ST | QTEAM MEETING - 7.23.2025 - 8 unit multifamily new constr... | Payment Due | Jun 17, 2025 |
| 1.5 mi | 4011 N HALL ST | QTEAM MEETING 7.22.2025 - 8 unit multifamily new construc... | Payment Due | Jun 17, 2025 |
| 1.5 mi | 4013 N HALL ST | QTEAM MEETING 7.17.2025 8 unit multifamily new construction | Payment Due | Jun 17, 2025 |
| 1.6 mi | 5601 BRYAN PKWY | QTEAM MEETING 9.3.2025 AM To build 5 unit condos - Total ... | Inspection Phase | Jun 30, 2025 |
| 1.7 mi | 4918 BRYAN ST | New construction MFD, 7 dwelling units, 4918 Bryan | Inspection Phase | Jun 02, 2023 |
| 1.7 mi | 4330 DICKASON AVE | New construction of multi-family// 4330 Dickason. | Plan Review | Jun 29, 2022 |
| 1.7 mi | 6001 LEWIS ST | Commercial New - Multifamily | Inspection Phase | Feb 08, 2024 |
| 1.7 mi | 1714 RIPLEY ST | New construction of five townhomes. | Inspection Phase | Jun 19, 2024 |
| 1.7 mi | 3555 DICKASON AVE | Q-Team Migrated NEW 4 LEVEL ABOVE GRADE GARAGE(1-3.5).LEV... | Payment Due | Mar 24, 2021 |
| 1.7 mi | 4319 SAN JACINTO ST | New Construction 9 unit multifamily. | Inspection Phase | Sep 17, 2024 |
| 1.7 mi | 4315 SAN JACINTO ST | New construction of 9 units multifamily | Payment Due | Sep 17, 2024 |
| 1.7 mi | 1717 N PEAK ST | Commercial New construction of a 7-unit multi-family buil... | Payment Due | Feb 27, 2025 |
| 1.7 mi | 5946 LEWIS ST | Building 5 condos -3 story. | Revisions Required | Aug 15, 2025 |
| 1.7 mi | 6027 LA VISTA DR | Construct 5 Plex WOOD FRAMESTUCCO/SIDINGCONDOS WITH ATTAC... | Revisions Required | Sep 19, 2025 |
| 1.8 mi | 4405 SCURRY ST | Q-Team 4405 Scurry for a New, Commercial Multifamily deve... | Revisions Required | Nov 20, 2024 |
| 1.8 mi | 4475 SCURRY ST | New Construction of 18 unit Multifamily. | Inspection Phase | Oct 11, 2024 |
| 1.8 mi | 4315 SCURRY ST | Q Team review for East Village New Construction for 15 -... | Inspection Phase | May 04, 2022 |
| 1.8 mi | 4320 SCURRY ST | Q Team for East Village II New Construction for 3 buildin... | Inspection Phase | May 19, 2022 |
| 1.8 mi | 5705 LIVE OAK ST | New Construction Multifamily-5705 Live Oak | Inspection Phase | Jul 24, 2024 |
| 1.9 mi | 6151 ORAM ST | Construction of New Multifamily Units | Permit About to Expire | Dec 23, 2024 |
| 1.9 mi | 2723 HONDO AVE | New construction, multifamily.6 dwelling units. | Inspection Phase | Nov 27, 2024 |
| 1.9 mi | 1255 ANNEX AVE | QTEAM MEETING 1.8.26 (1:30 PM) New Construction - Multifa... | Inspection Phase | Nov 24, 2025 |
| 2.0 mi | 6235 ORAM ST | QTEAM MEETING 1.29.2026 (9AM) 40 unit, 4 story apartment ... | Plan Review | Jan 12, 2026 |
| 2.0 mi | 2811 HONDO AVE | New construction of 12 unit townhome on two lots; 6 units... | Inspection Phase | Jul 16, 2021 |
| 2.0 mi | 3608 SAN JACINTO ST | New residential townhomes | Inspection Phase | May 26, 2022 |
| 2.0 mi | 2702 MCKINNEY AVE | 2700 McKinney - 21 Story Mixed Use Tower Including Retail... | Payment Due | Jun 09, 2022 |
| 2.0 mi | 2314 ARROYO AVE | he proposed work includes the construction of three-story... | In Review | Sep 16, 2025 |
| 2.0 mi | 2505 TURTLE CREEK BLVD | New construction of 20-story assisted living building wit... | Inspection Phase | Aug 06, 2024 |
| 2.1 mi | 3700 INWOOD RD | QTEAM MEETING Senior Living community with independent li... | Inspection Phase | May 28, 2025 |
| 2.2 mi | 1000 N PEAK ST | QTEAM 1000 N Peak. New Construction of 54-unit, 3-story M... | Revisions Required | May 15, 2025 |
| 2.2 mi | 2514 LUCAS DR | (1131) MULTI-FAMILY DWELLING / 5 UNIT MULTIFAMILY | Inspection Phase | Feb 24, 2025 |
| 2.4 mi | 3031 N HARWOOD ST | QTEAM MEETING 9.4.2025 3131 N Harwood For Office and 303... | Revisions Required | Jul 21, 2025 |
| 2.4 mi | 4501 AFTON ST | Residential use | Inspection Phase | Nov 23, 2021 |
| 2.5 mi | 5810 REIGER AVE | QTEAM MEETING 11.20.2025 (9 am) New construction of group... | Inspection Phase | Oct 23, 2025 |
| 2.6 mi | 4918 EAST SIDE AVE | New construction of 5-unit townhome building | Application About to Expire | Jun 28, 2024 |
| 2.6 mi | 4618 COLUMBIA AVE | Multifamily-2 New Duplex | Application About to Expire | Dec 16, 2021 |
| 2.8 mi | 2702 KIMSEY DR | THE ASTRID APARTMENTS PROJECT WILL BE A NEW, THREE-STORY ... | In Review | Aug 29, 2025 |
| 2.8 mi | 3201 MAIN ST | QTEAM MEETING 12.3.2025 - NOT USING SB840, CONFIRMED WITH... | Application About to Expire | Oct 16, 2025 |
| 2.8 mi | 2710 KIMSEY DR | New MFD project for a 3 story 5 unit townhome apartment c... | Plan Review | Jan 22, 2025 |
| 2.9 mi | 8300 DOUGLAS AVE | QTEAM MEETING 3.2.2026 / 1.14.2026 (9AM) New construction... | Plan Review | Nov 06, 2025 |
No notes yet
Debt-to-Value and Refinancing Risk: At $45.8M against a $26.9M appraised value, the loan-to-value ratio is 170%, signaling distressed underwriting or a significant valuation gap—the $65.4M estimated sale price may be aspirational. The MetLife loan originated in Dec 2018 with no maturity date disclosed; absent a stated term, refinancing risk at current rates is opaque but likely acute given the LTV and vintage.
Leverage and Seller Motivation: Debt per unit of $395K against estimated per-unit value of $564K ($26.9M appraised) or $564K (sale price) indicates high leverage across either metric. Eight years of ownership with three transactions suggests opportunistic hold-and-refi behavior rather than distress, but the negative equity position (appraisal basis) could force a motivated sale if refinance windows close.
Ownership Structure: Absentee corporate ownership by KnoxBridge since 2017, with a stand-alone refinance in Dec 2018, shows no foreclosure or distress deed markers in the chain. Clean provenance from CIM/Lion Gables does not signal prior default, though the 2018 refi timing and missing rate/term data warrant title and loan document review.
No notes yet
Estimated from loan records, rental listings, and appraisal data using industry-standard assumptions.
Based on most recent loan: $45,750,000 (Dec 2018, attom)
Computed from nearby properties within 3 miles of similar vintage
No notes yet
CARRARA AT COLE is a 1995-built, 116-unit garden-style apartment community in Dallas with brick exterior and wood-frame construction across three stories. The property totals 131.6K gross building area with 100.6K net leasable area, positioned in an excellent-quality asset rated in good condition. Located in a high-walkability area (91 walk score), the property benefits from urban accessibility, though specific parking configuration, amenities detail, and utility/pet terms are not documented in available records.
No notes yet
No notes yet
Carrara at Cole targets an affluent urban core with limited workforce housing depth. The 1-mile radius median household income of $135.7K supports premium positioning, but 40.8% of households earn $150K+—indicating a highly concentrated, high-income market vulnerable to economic downturns among a narrow tenant base. Renter concentration jumps from 59.6% (1-mile) to 66.7% (3-mile), signaling stronger multifamily demand in the broader submarket, though the affordability ratio of 17.2–19.1% across all radii remains tight for non-affluent renters. The 5-mile radius softens materially—median income drops to $113.6K and $150K+ earners comprise only 30.1%—suggesting the property's true trade area may be constrained to the urban core if market-rate positioning holds.
Source: US Census ACS 5-Year Estimates (2023) · 10 tracts (1mi)
No notes yet
No notes yet
No notes yet
Appraisal History – Carrara at Cole
Limited data (single 2025 appraisal) prevents trend analysis, but the current valuation of $232.0K per unit reflects recent 7.6% appreciation in a stabilizing market. The land-to-improvement split (74% land / 26% improvements) is unusually skewed, suggesting either significant underlying acreage, undervalued or aging structural assets, or conservative improvement depreciation—warranting on-site inspection and cost-approach validation before underwriting. At $19.9M land value alone, any redevelopment scenario (new construction, repositioning) becomes a legitimate exit thesis if operations or market conditions deteriorate.
| Year | Total Value | Change |
|---|---|---|
| 2025 | $26,916,060 | +7.6% |
No notes yet
No notes yet
No notes yet