4011 COMMERCE ST, DALLAS, TX, 752261712
$16,221,710
2025 Appraised Value
↑ 780.8% from prior year
The critical investment signal is execution risk masquerading as a stabilized asset: the property is only 25% complete despite a 2024 build year and $16.2M appraisal, yet carries debt and is listed for sale, suggesting either capital constraints or aggressive underwriting that needs validation. Financially, the $23.2K per-unit LTV against a $73.8K appraised value appears conservative, but the $7.3M estimated sale price implies a 55% markdown—a distress indicator that conflicts with the ownership entity's 29.8-year hold and three refinancings in six years, signaling debt-cycling behavior and potential lender friction. Demographically, THE JUNIPER faces a renter affordability mismatch in its immediate 1-mile radius ($80.1K median income, 21.9% rent burden) but can access higher-income tenants 2–3 miles out ($111.1K median, 19.1% burden) if rent positioning is disciplined; the 30.9% pipeline-to-inventory ratio and soft submarket vacancy trend will compress near-term rent growth. Operationally, the garden-style Class B finishes (builder-grade cabinetry, laminate counters, standard appliances) offer limited value-add upside, and a single 5-star Google review during 25% construction completion is noise, not validation. Pass or require completion-to-stabilization holdback: construction execution, lease-up velocity, and true debt maturity terms must be clarified before deployment; the 55% price-to-appraisal gap and absentee ownership structure suggest motivated seller, but unit economics and capital needs remain opaque.
No notes yet
Juniper Place at Eastwind is a Junius Heights gem with large 1- and 2-bedroom floorplans with washer dryer connections. Come home to newly renovated apartments with interior corridor access, faux wood flooring, big kitchens, and so much more.
The Juniper is a newly completed (2024) garden-style asset with builder-grade finishes positioned as Class B new construction. All 12 analyzed units display consistent 2024-era specifications: white painted cabinetry, black speckled laminate countertops, standard white appliances (GE/Whirlpool tier), vinyl plank flooring, and fresh paint—indicating no partial renovation patchwork. Exterior elevations show clean contemporary design with light-colored siding and mature landscaping; interiors are basic but clean with minimal backsplash treatment and dome/basic pendant lighting throughout. The property's value-add potential is muted given the lack of pre-existing dated finishes to upgrade, though future kitchen/bath repositioning (granite/quartz counters, stainless appliances) would improve unit economics in a stabilized market.
/ ·
This photo was not identified as property-related.
No AI analysis available for this photo.
No notes yet
The Juniper's walkability profile—61 walk score, 43 transit, 63 bike score—positions it as car-dependent with modest multimodal appeal, limiting tenant demand among transit-preferring renters but supporting a suburban-oriented demographic. Without rent data, we cannot assess price-to-location alignment, though a "Somewhat Walkable" designation typically anchors 15–25% below comparable urban-core properties in Dallas. The 220-unit scale suggests institutional multifamily positioning, which generally commands premium pricing; this location would need to compete on amenities density, finishes, or proximity to secondary employment clusters rather than walkability alone.
No notes yet
The 30.9% pipeline-to-inventory ratio presents moderate near-term competitive pressure, though permit status suggests execution risk may temper actual supply. Sixty-eight units across 68 nearby projects indicate fragmented development rather than one dominant competitor, but the deteriorating vacancy trend in the submarket implies new supply will encounter softer demand than historical norms. Multiple permits at 7207 Gaston Ave (ten separate applications) with "About to Expire" or "Payment Due" status suggest delay or abandonment—reducing the threat materially if these don't convert to active construction. Delivery timing remains opaque without start/completion dates, but the permitting friction argues for modeled conservatism on rent growth absorption over the next 18–24 months.
| Distance | Address | Description | Status | Filed |
|---|---|---|---|---|
| 0.4 mi | 5601 BRYAN PKWY | QTEAM MEETING 9.3.2025 AM To build 5 unit condos - Total ... | Inspection Phase | Jun 30, 2025 |
| 0.5 mi | 5705 LIVE OAK ST | New Construction Multifamily-5705 Live Oak | Inspection Phase | Jul 24, 2024 |
| 0.5 mi | 4918 BRYAN ST | New construction MFD, 7 dwelling units, 4918 Bryan | Inspection Phase | Jun 02, 2023 |
| 0.6 mi | 4918 EAST SIDE AVE | New construction of 5-unit townhome building | Application About to Expire | Jun 28, 2024 |
| 0.6 mi | 6001 LEWIS ST | Commercial New - Multifamily | Inspection Phase | Feb 08, 2024 |
| 0.6 mi | 5946 LEWIS ST | Building 5 condos -3 story. | Revisions Required | Aug 15, 2025 |
| 0.6 mi | 6027 LA VISTA DR | Construct 5 Plex WOOD FRAMESTUCCO/SIDINGCONDOS WITH ATTAC... | Revisions Required | Sep 19, 2025 |
| 0.6 mi | 5810 REIGER AVE | QTEAM MEETING 11.20.2025 (9 am) New construction of group... | Inspection Phase | Oct 23, 2025 |
| 0.7 mi | 4618 COLUMBIA AVE | Multifamily-2 New Duplex | Application About to Expire | Dec 16, 2021 |
| 0.7 mi | 1255 ANNEX AVE | QTEAM MEETING 1.8.26 (1:30 PM) New Construction - Multifa... | Inspection Phase | Nov 24, 2025 |
| 0.8 mi | 1906 MOSER AVE | QTEAM MEETING 3.10.2026 (All Day) new multifamily constru... | Revisions Required | Jan 20, 2026 |
| 0.8 mi | 6235 ORAM ST | QTEAM MEETING 1.29.2026 (9AM) 40 unit, 4 story apartment ... | Plan Review | Jan 12, 2026 |
| 0.8 mi | 1722 N FITZHUGH AVE | 5 Townhome Units New Construction (Multifamily) | Plan Review | Dec 10, 2025 |
| 0.8 mi | 6151 ORAM ST | Construction of New Multifamily Units | Permit About to Expire | Dec 23, 2024 |
| 0.9 mi | 4704 MONARCH ST | Multifamily New Construction, 8 townhouses with 2 bedrooms | Inspection Phase | Apr 01, 2025 |
| 0.9 mi | 1000 N PEAK ST | QTEAM 1000 N Peak. New Construction of 54-unit, 3-story M... | Revisions Required | May 15, 2025 |
| 0.9 mi | 4475 SCURRY ST | New Construction of 18 unit Multifamily. | Inspection Phase | Oct 11, 2024 |
| 0.9 mi | 4405 SCURRY ST | Q-Team 4405 Scurry for a New, Commercial Multifamily deve... | Revisions Required | Nov 20, 2024 |
| 0.9 mi | 4320 SCURRY ST | Q Team for East Village II New Construction for 3 buildin... | Inspection Phase | May 19, 2022 |
| 0.9 mi | 5731 RICHMOND AVE | QTEAM MEETING 10.21.2025 (AM) New construction of six-uni... | Inspection Phase | Sep 23, 2025 |
| 1.0 mi | 1902 N CARROLL AVE | New Construction of 3 story 33 townhouses with garage at ... | Inspection Phase | Jul 01, 2022 |
| 1.0 mi | 4315 SCURRY ST | Q Team review for East Village New Construction for 15 -... | Inspection Phase | May 04, 2022 |
| 1.0 mi | 4315 SAN JACINTO ST | New construction of 9 units multifamily | Payment Due | Sep 17, 2024 |
| 1.0 mi | 4319 SAN JACINTO ST | New Construction 9 unit multifamily. | Inspection Phase | Sep 17, 2024 |
| 1.1 mi | 1717 N PEAK ST | Commercial New construction of a 7-unit multi-family buil... | Payment Due | Feb 27, 2025 |
| 1.1 mi | 1714 RIPLEY ST | New construction of five townhomes. | Inspection Phase | Jun 19, 2024 |
| 1.4 mi | 4609 MANETT ST | QTEAM MEETING 8.12.2025 (1:30 PM) new townhomes | Revisions Required | Jun 17, 2025 |
| 1.4 mi | 3608 SAN JACINTO ST | New residential townhomes | Inspection Phase | May 26, 2022 |
| 1.5 mi | 3201 MAIN ST | QTEAM MEETING 12.3.2025 - NOT USING SB840, CONFIRMED WITH... | Application About to Expire | Oct 16, 2025 |
| 1.6 mi | 3501 ASH LN | New 293 units apartment complex with wrapping 5 story par... | Revisions Required | Aug 05, 2023 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING 3.19.2026 (ALL DAY) - Connecticut at White ... | Payment Due | Feb 20, 2026 |
| 1.9 mi | 7207 GASTON AVE | Phase 2 multi-family addition - Building 24 - 2 units – 1... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 4777 N CENTRAL EXPY | New podium structured multifamily building with below gra... | Inspection Phase | Jul 02, 2024 |
| 1.9 mi | 1701 S MALCOLM X BLVD | Q-Team Review, new Construction of two-story structure co... | Inspection Phase | Nov 18, 2021 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | Phase 2 multi-family addition - Building 7 - 6 units - 33... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | Phase 2 multi-family addition - Building 17 - 7 units – 4... | Application About to Expire | Feb 13, 2026 |
| 1.9 mi | 7207 GASTON AVE | QTEAM MEETING TBD Phase 2 multi-family addition - Buildin... | Application About to Expire | Feb 13, 2026 |
| 2.0 mi | 4555 TRAVIS ST | QTEAM PROJECT The project is a mixed use project of appro... | Revisions Required | Aug 26, 2022 |
| 2.1 mi | 5115 MCKINNEY AVE | New construction of mixed use building.90 multifamily uni... | Plan Review | Jul 16, 2023 |
| 2.1 mi | 720 S GOOD LATIMER EXPY | Q Team Review New construction of a 21 level residential ... | Plan Review | Jan 31, 2023 |
| 2.1 mi | 2522 MERLIN ST | NEW CONSTRUCCION MULTIFAMILY | Additional Info Required | Mar 09, 2026 |
| 2.1 mi | 3108 SOUTH BLVD | New 5 unit multi-family dwelling. Previous permit number:... | Revisions Required | Feb 20, 2025 |
| 2.2 mi | 3000 SOUTH BLVD | CONSTRUCTION OF NEW TWO STORY STUDIO APARTMENTS | Revisions Required | Jan 21, 2025 |
| 2.2 mi | 2702 MCKINNEY AVE | 2700 McKinney - 21 Story Mixed Use Tower Including Retail... | Payment Due | Jun 09, 2022 |
| 2.3 mi | 2013 JACKSON ST | ***Manual Recreation*** 1906051126*** - New Multifamily C... | Inspection Phase | Jul 10, 2025 |
| 2.5 mi | 3555 DICKASON AVE | Q-Team Migrated NEW 4 LEVEL ABOVE GRADE GARAGE(1-3.5).LEV... | Payment Due | Mar 24, 2021 |
| 2.5 mi | 3900 LEMMON AVE | New construction of MFD project. 406 dwelling units with ... | Revisions Required | Aug 21, 2024 |
| 2.5 mi | 1919 S HARWOOD ST | QTEAM MEETING 1.29.2026 (1:30 PM) 4 story multifamily apa... | Revisions Required | Dec 29, 2025 |
| 2.5 mi | 2095 S HARWOOD ST | THE PROJECT CONSISTS OF NEW CONSTRUCTION IMPROVEMENTS FOR... | Payment Due | Jul 18, 2023 |
| 2.5 mi | 1905 CORINTH ST | QTEAM MEETING 11.6.2025 (1:30 PM) Two four story multifam... | Revisions Required | Sep 19, 2025 |
| 2.6 mi | 1819 LEAR ST | PROJECT CONSIST OF (2) 5 UNIT 4-STORY NEW CONSTRUCTION TO... | Revisions Required | Nov 24, 2025 |
| 2.6 mi | 2505 TURTLE CREEK BLVD | New construction of 20-story assisted living building wit... | Inspection Phase | Aug 06, 2024 |
| 2.7 mi | 4005 N HALL ST | QTEAM MEETING - 7.23.2025 - 8 unit multifamily new constr... | Payment Due | Jun 17, 2025 |
| 2.7 mi | 3031 N HARWOOD ST | QTEAM MEETING 9.4.2025 3131 N Harwood For Office and 303... | Revisions Required | Jul 21, 2025 |
| 2.7 mi | 4011 N HALL ST | QTEAM MEETING 7.22.2025 - 8 unit multifamily new construc... | Payment Due | Jun 17, 2025 |
| 2.7 mi | 4013 N HALL ST | QTEAM MEETING 7.17.2025 8 unit multifamily new construction | Payment Due | Jun 17, 2025 |
| 2.7 mi | 1900 S ERVAY ST | MANUAL CONVERSION: 1903061211 - EC, FS, FA, PL, ME, EL, G... | Inspection Phase | May 13, 2025 |
| 2.7 mi | 2220 S ERVAY ST | NEW GROUND UP MULTIFAMILY DWELLING, FIVE-STORY WITH 315 A... | Payment Due | Feb 12, 2025 |
| 2.8 mi | 4519 ELSIE FAYE HEGGINS ST | The development will consist of (2) fourplex buildings of... | Application About to Expire | Aug 11, 2025 |
| 2.9 mi | 1405 SEEGAR ST | (7) four story townhomes. Site development including driv... | Revisions Required | Jun 12, 2025 |
| 3.0 mi | 4330 DICKASON AVE | New construction of multi-family// 4330 Dickason. | Plan Review | Jun 29, 2022 |
No notes yet
Ownership and Debt Structure Signal Distress Risk
The property presents conflicting signals: a 29.8-year hold by 3900 Commerce 1996 Ltd suggests stable, long-term ownership, yet three refinancings in six years (2012, 2014, 2018) indicate repeated debt cycling rather than buydown discipline. The $5.1M loan carries a $23.2K per-unit LTV against a $73.8K per-unit appraised value, but the massive gap between appraised value ($16.2M) and estimated sale price ($7.3M) signals severe distress—either heavy capital needs (property is 25% complete) or market repricing. With no maturity date, DSCR, or rate disclosed, refinancing risk is opaque, but an absentee corporate owner cycling debt every 2–4 years typically indicates difficulty accessing conventional financing and potential motivated-seller positioning.
No notes yet
Estimated from loan records, rental listings, and appraisal data using industry-standard assumptions.
Based on most recent loan: $5,100,000 (Nov 2018, attom)
Computed from nearby properties within 3 miles of similar vintage
No notes yet
The Juniper is a 220-unit garden-style apartment community delivered in 2024 with 1- and 2-bedroom floor plans across 393.7K SF of gross building area. The property features in-unit washer/dryer connections, faux wood flooring, and private patios/Juliette balconies in select units, positioning it as a quality product in the GOOD/EXCELLENT range with professional management and 24-hour emergency maintenance. Located in the Junius Heights submarket 0.2 miles from Munger Park and 1 mile from Lower Greenville dining/entertainment, the property sits on DART Route 009 with a walk score of 61; water is included in rent while residents cover electric and cable/internet. The development is pet-friendly with limited-access gating and remains 25% complete at listing.
No notes yet
Estimated from listed vacancies vs total units
Min/avg/max asking rents from property website
| Unit | Beds | Baths | Sqft | Rent | Status | Listed | Days |
|---|---|---|---|---|---|---|---|
| 2BR | 2 | 999 | $1,199 | Inactive | Mar 24 | — | |
|
Mar $1,199
|
|||||||
| 1BR | 1 | 588 | $899 | Inactive | Mar 24 | — | |
|
Mar $899
|
|||||||
No notes yet
Rent-to-income mismatch signals pricing risk at property-level. The immediate 1-mile ring shows median household income of $80.1K against a 21.9% affordability ratio—tight for a 220-unit new lease-up competing for renters earning under $75K (51.4% of that submarket). The 3-mile radius offers relief: $111.1K median income, 19.1% affordability ratio, and 30.9% earning $150K+, indicating the property can access higher-income renters if positioned correctly. Critical tension: renter concentration remains flat 67.5%–67.8% across 1–3 miles, but income distribution bifurcates sharply—the immediate trade area is working-class skewed (34.2% earn under $50K) while the wider ring is affluent-skewed (47.3% earn above $100K). This suggests THE JUNIPER must either undercut rent assumptions for local demand or capture commuters/white-collar workers from the 3-mile ring, where job density and wage levels likely exist. The 5-mile ring's income reversion ($100.9K) and lower renter percentage (63.2%) indicate geographic limits to the tenant draw.
Source: US Census ACS 5-Year Estimates (2023) · 10 tracts (1mi)
No notes yet
No notes yet
Pet Friendly
No notes yet
Appraisal Summary:
The Juniper's 2025 appraisal of $16.2M reflects early-stage construction valuation at 25% completion, with the 780.8% YoY jump representing initial appraisal establishment rather than market movement. At $73.7K per unit, the valuation is heavily weighted to improvements ($65.4K/unit) versus land ($8.4K/unit), typical for a new-build where construction sunk costs dominate residual land value. With only one appraisal in the dataset, no trend analysis or market repricing signal is available; continued monitoring through project completion will be essential to validate the underwriting assumption and assess actual lease-up performance.
| Year | Total Value | Change |
|---|---|---|
| 2025 | $16,221,710 | +780.8% |
No notes yet
The Juniper's single 5-star review provides no meaningful signal on property quality or management. With only one review across 220 units, the 5.0 rating is statistically meaningless—likely from a recent move-in before operational friction surfaces. The property is still under construction (25% complete), so this review reflects pre-occupancy enthusiasm rather than lived experience with maintenance responsiveness, lease enforcement, or day-to-day management. Establish a re-review protocol at lease-up completion and stabilization (12+ months post-occupancy) to capture genuine operational performance; current Google data should be excluded from underwriting thesis validation.
1 reviews total
Great Place to Live!
I recently moved into Juniper Place Apartments, and I couldn’t be happier with my decision! The apartments are incredibly spacious, giving me plenty of room to feel comfortable and at home. One of the things I love most is how quiet the property is—it’s so peaceful, making it the perfect place to relax after a long day.
Another huge plus is the washer & dryer connections in the unit, which add so much convenience. The community feels well-maintained, and overall, it’s been a great experience so far. If you’re looking for a quiet, spacious, and comfortable place to live, I highly recommend Juniper Place Apartments!
No notes yet
No notes yet